Please fix abutment reinforcement detailing - re-entered

보낸 화일에서 교대2의 P2,P3 철근을 말하는 것입니다... 그리고, 또 한가지 날개벽 철근 교대2의 WL10, WR10 철근의 CTC의 간격을 250으로 입력해서 적용했는데, 도면출력물은 125로 되어있습니다... 이것을 수정 부탁드립니다...

Answer

안녕하세요. 한길아이티입니다. 1) P2,P3는 길이 및 개수를 확인한 바 이상이 없습니다. 어느 부분의 값을 말씀하시는 것인 지 파악을 못하였습니다. 2) A1 우측, A2 좌측,우측의 날개벽의 배력철근 입력을 보시면 간격이 125-250을 입력이 되어 있습니다. 구간D의 인장면 간격을 수정하신 후 확인하시면 이상이 없습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#268560Question about the calculation report1812026-09-29
AnsweredAAbutPier#268548Tendon force when placing tendons in the pier cap2222026-09-29
AnsweredAAbutPier#268520Pier seismic check2572026-09-23
AnsweredAAbutPier#268509Transverse reinforcement factor, K2022026-09-22
AnsweredAAbutPier#268492Girder positions in slab dimensions3672026-09-21
AnsweredAAbutPier#268483Transverse pile member forces are "0" in pier pile foundation check2032026-09-21
AnsweredAAbutPier#268482Top and bottom rebar detailing error in pier foundation STM2242026-09-21
AnsweredAAbutPier#268476Question about slab dimensions3132026-09-19
AnsweredAAbutPier#268470Settlement and bearing capacity2742026-09-18
AnsweredAAbutPier#268462Superstructure wind load in the calculation report1942026-09-18
AnsweredAAbutPier#268451Changing bearing location922026-09-18
AnsweredAAbutPier#268445Main rebar placement3062026-09-17
AnsweredAAbutPier#268438Modeling error in seismic analysis4112026-09-17
AnsweredAAbutPier#268433Pier alignment center1892026-09-17
AnsweredAAbutPier#268431Please check the design ground surface displacement2372026-09-17
AnsweredAAbutPier#268422Question about pier2752026-09-17
AnsweredAAbutPier#268416Wprov calculation in the structural calculation report2622026-09-17
AnsweredAAbutPier#268402Increasing the number of column main rebars3982026-09-16
AnsweredAAbutPier#268392Question about cast-in-place piles2262026-09-16
AnsweredAAbutPier#268387Error when entering reinforcing rebar1802026-09-16
Sign in to ask