Distribution rebar for two-layer wall rebar

벽체 2단철근의 배력근이 표현이 안되네요.... 완전히 빠졌네요.... 부탁드립니다....

Answer

안녕하세요. 한길아이티입니다. 전단 및 배력철근입력에서 벽체부 2단철근에 대한 입력이 누락되어 있습니다. 입력 후 [벽체부 배근]에서 배근폭등을 조정하신 후 확인하시면 이상이 없습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#268560Question about the calculation report1812026-09-29
AnsweredAAbutPier#268548Tendon force when placing tendons in the pier cap2222026-09-29
AnsweredAAbutPier#268520Pier seismic check2572026-09-23
AnsweredAAbutPier#268509Transverse reinforcement factor, K2022026-09-22
AnsweredAAbutPier#268492Girder positions in slab dimensions3702026-09-21
AnsweredAAbutPier#268483Transverse pile member forces are "0" in pier pile foundation check2032026-09-21
AnsweredAAbutPier#268482Top and bottom rebar detailing error in pier foundation STM2242026-09-21
AnsweredAAbutPier#268476Question about slab dimensions3132026-09-19
AnsweredAAbutPier#268470Settlement and bearing capacity2742026-09-18
AnsweredAAbutPier#268462Superstructure wind load in the calculation report1942026-09-18
AnsweredAAbutPier#268451Changing bearing location922026-09-18
AnsweredAAbutPier#268445Main rebar placement3062026-09-17
AnsweredAAbutPier#268438Modeling error in seismic analysis4112026-09-17
AnsweredAAbutPier#268433Pier alignment center1892026-09-17
AnsweredAAbutPier#268431Please check the design ground surface displacement2372026-09-17
AnsweredAAbutPier#268422Question about pier2752026-09-17
AnsweredAAbutPier#268416Wprov calculation in the structural calculation report2632026-09-17
AnsweredAAbutPier#268402Increasing the number of column main rebars3982026-09-16
AnsweredAAbutPier#268392Question about cast-in-place piles2262026-09-16
AnsweredAAbutPier#268387Error when entering reinforcing rebar1802026-09-16
Sign in to ask