Please check abutment bearing detail length
교대일반도 C1과 C2의 길이 확인바람 시점측 슈각도는 89.975인데 C1의 길이가 518인데 (유간+슬래브끝단+슈각도의 길이+슈길이) 유간(55),슬래브끝단(50),슈각도 길이(0.13),슈길이(400)인데 여기서 슈각도의 길이(13)가 크게 들어 가는것 같은데 확인바람 상부형식은 PSC BEAM교 25M로 빔 폭이 (600 입니다) 종점측은 더 확인이 않되는 각도라 우선 시점측에 대한것만 알고 싶습니다
Answer
안녕하세요. 한길아이티입니다. C1길이는 교대의 흉벽앞선과 슈중심사이의 거리이며 현재 표기된 518이 맞습니다. 교대가 90도의 직각이므로 모든 슈가 같은 값으로 설정이 되어있습니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #268560 | Question about the calculation report | 181 | 2026-09-29 |
| Answered | AAbutPier | #268548 | Tendon force when placing tendons in the pier cap | 222 | 2026-09-29 |
| Answered | AAbutPier | #268520 | Pier seismic check | 257 | 2026-09-23 |
| Answered | AAbutPier | #268509 | Transverse reinforcement factor, K | 202 | 2026-09-22 |
| Answered | AAbutPier | #268492 | Girder positions in slab dimensions | 373 | 2026-09-21 |
| Answered | AAbutPier | #268483 | Transverse pile member forces are "0" in pier pile foundation check | 203 | 2026-09-21 |
| Answered | AAbutPier | #268482 | Top and bottom rebar detailing error in pier foundation STM | 224 | 2026-09-21 |
| Answered | AAbutPier | #268476 | Question about slab dimensions | 313 | 2026-09-19 |
| Answered | AAbutPier | #268470 | Settlement and bearing capacity | 274 | 2026-09-18 |
| Answered | AAbutPier | #268462 | Superstructure wind load in the calculation report | 194 | 2026-09-18 |
| Answered | AAbutPier | #268451 | Changing bearing location | 92 | 2026-09-18 |
| Answered | AAbutPier | #268445 | Main rebar placement | 308 | 2026-09-17 |
| Answered | AAbutPier | #268438 | Modeling error in seismic analysis | 411 | 2026-09-17 |
| Answered | AAbutPier | #268433 | Pier alignment center | 189 | 2026-09-17 |
| Answered | AAbutPier | #268431 | Please check the design ground surface displacement | 237 | 2026-09-17 |
| Answered | AAbutPier | #268422 | Question about pier | 277 | 2026-09-17 |
| Answered | AAbutPier | #268416 | Wprov calculation in the structural calculation report | 264 | 2026-09-17 |
| Answered | AAbutPier | #268402 | Increasing the number of column main rebars | 398 | 2026-09-16 |
| Answered | AAbutPier | #268392 | Question about cast-in-place piles | 226 | 2026-09-16 |
| Answered | AAbutPier | #268387 | Error when entering reinforcing rebar | 180 | 2026-09-16 |