첨부한 파일에 교각일반도를 보시면 두가지 블럭을 추가하였습니다... 두 블럭 다 dxf로 저장후 확장자를 dlk로 바꾸어서 사용하였습니다... 블럭추가후 도면배치시 두 블럭 같이 움직입니다... 확인부탁드립니다... 그리고 아래에 도면추가 수정사항에 대해 일부분이 수정패치되었는 걸로 알고 있는데 나머지는 언제쯤 되는지.... 그리고 P1, P2 교각 배근도(3)에 간격재 상세가 나올질 않습니다... 확인부탁드립니다... 더운 날씨에 수고하십시오....
Answer
안녕하세요. 한길아이티입니다. 블럭이동에 대한 부분은 이미 패치에 적용되었으며 간격재에 대한 사항은 수정하여 패치에 적용하도록 하겠습니다.
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #268560 | Question about the calculation report | 181 | 2026-09-29 |
| Answered | AAbutPier | #268548 | Tendon force when placing tendons in the pier cap | 222 | 2026-09-29 |
| Answered | AAbutPier | #268520 | Pier seismic check | 257 | 2026-09-23 |
| Answered | AAbutPier | #268509 | Transverse reinforcement factor, K | 202 | 2026-09-22 |
| Answered | AAbutPier | #268492 | Girder positions in slab dimensions | 374 | 2026-09-21 |
| Answered | AAbutPier | #268483 | Transverse pile member forces are "0" in pier pile foundation check | 203 | 2026-09-21 |
| Answered | AAbutPier | #268482 | Top and bottom rebar detailing error in pier foundation STM | 224 | 2026-09-21 |
| Answered | AAbutPier | #268476 | Question about slab dimensions | 313 | 2026-09-19 |
| Answered | AAbutPier | #268470 | Settlement and bearing capacity | 274 | 2026-09-18 |
| Answered | AAbutPier | #268462 | Superstructure wind load in the calculation report | 194 | 2026-09-18 |
| Answered | AAbutPier | #268451 | Changing bearing location | 92 | 2026-09-18 |
| Answered | AAbutPier | #268445 | Main rebar placement | 308 | 2026-09-17 |
| Answered | AAbutPier | #268438 | Modeling error in seismic analysis | 411 | 2026-09-17 |
| Answered | AAbutPier | #268433 | Pier alignment center | 189 | 2026-09-17 |
| Answered | AAbutPier | #268431 | Please check the design ground surface displacement | 239 | 2026-09-17 |
| Answered | AAbutPier | #268422 | Question about pier | 277 | 2026-09-17 |
| Answered | AAbutPier | #268416 | Wprov calculation in the structural calculation report | 267 | 2026-09-17 |
| Answered | AAbutPier | #268402 | Increasing the number of column main rebars | 398 | 2026-09-16 |
| Answered | AAbutPier | #268392 | Question about cast-in-place piles | 226 | 2026-09-16 |
| Answered | AAbutPier | #268387 | Error when entering reinforcing rebar | 180 | 2026-09-16 |