AnsweredAAbutPierQ&A #1848792004-02-26 13:48 · Views 23

Please review

1.시점 및 횡단구성에서 SKEW교량에 곡선교량일 경우 입력 도면을 첨부하오니 검토 바랍니다

Answer

안녕하세요. 한길아이티입니다. 전화로 말씀드렸습니다. 감사합니다.

Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#268560Question about the calculation report1822026-09-29
AnsweredAAbutPier#268548Tendon force when placing tendons in the pier cap2222026-09-29
AnsweredAAbutPier#268520Pier seismic check2572026-09-23
AnsweredAAbutPier#268509Transverse reinforcement factor, K2022026-09-22
AnsweredAAbutPier#268492Girder positions in slab dimensions3872026-09-21
AnsweredAAbutPier#268483Transverse pile member forces are "0" in pier pile foundation check2062026-09-21
AnsweredAAbutPier#268482Top and bottom rebar detailing error in pier foundation STM2272026-09-21
AnsweredAAbutPier#268476Question about slab dimensions3142026-09-19
AnsweredAAbutPier#268470Settlement and bearing capacity2752026-09-18
AnsweredAAbutPier#268462Superstructure wind load in the calculation report1942026-09-18
AnsweredAAbutPier#268451Changing bearing location942026-09-18
AnsweredAAbutPier#268445Main rebar placement3302026-09-17
AnsweredAAbutPier#268438Modeling error in seismic analysis4132026-09-17
AnsweredAAbutPier#268433Pier alignment center1902026-09-17
AnsweredAAbutPier#268431Please check the design ground surface displacement2442026-09-17
AnsweredAAbutPier#268422Question about pier2782026-09-17
AnsweredAAbutPier#268416Wprov calculation in the structural calculation report2692026-09-17
AnsweredAAbutPier#268402Increasing the number of column main rebars4022026-09-16
AnsweredAAbutPier#268392Question about cast-in-place piles2292026-09-16
AnsweredAAbutPier#268387Error when entering reinforcing rebar1802026-09-16
Sign in to ask