AnsweredAAbutPierQ&A #1847872004-02-19 18:55 · Views 50

Issue with the cross section

구배가 이상하게 꺼구로 표시가 되네여

Answer

안녕하세요. 한길아이티입니다. lin 선형파일에서 편구배가 설정된데로 보여지고 있습니다. ALine 프로그램으로 선형파일에서 편구배를 확인하신후 선형을 다시 불러오시기 바랍니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#268560Question about the calculation report1822026-09-29
AnsweredAAbutPier#268548Tendon force when placing tendons in the pier cap2222026-09-29
AnsweredAAbutPier#268520Pier seismic check2572026-09-23
AnsweredAAbutPier#268509Transverse reinforcement factor, K2022026-09-22
AnsweredAAbutPier#268492Girder positions in slab dimensions3882026-09-21
AnsweredAAbutPier#268483Transverse pile member forces are "0" in pier pile foundation check2062026-09-21
AnsweredAAbutPier#268482Top and bottom rebar detailing error in pier foundation STM2272026-09-21
AnsweredAAbutPier#268476Question about slab dimensions3142026-09-19
AnsweredAAbutPier#268470Settlement and bearing capacity2752026-09-18
AnsweredAAbutPier#268462Superstructure wind load in the calculation report1942026-09-18
AnsweredAAbutPier#268451Changing bearing location942026-09-18
AnsweredAAbutPier#268445Main rebar placement3302026-09-17
AnsweredAAbutPier#268438Modeling error in seismic analysis4152026-09-17
AnsweredAAbutPier#268433Pier alignment center1902026-09-17
AnsweredAAbutPier#268431Please check the design ground surface displacement2442026-09-17
AnsweredAAbutPier#268422Question about pier2782026-09-17
AnsweredAAbutPier#268416Wprov calculation in the structural calculation report2692026-09-17
AnsweredAAbutPier#268402Increasing the number of column main rebars4022026-09-16
AnsweredAAbutPier#268392Question about cast-in-place piles2292026-09-16
AnsweredAAbutPier#268387Error when entering reinforcing rebar1812026-09-16
Sign in to ask