Error in pile calculation...
안녕하세요.. [한길 담당자] 부탁 드립니다. 말뚝계산시에 다운되거나..계산값이 나오지 않는데. 어디서 문제가 있는지 모르겠네요. 화일첨부합니다.
Answer
안녕하세요. 한길아이티입니다. [교각입력]-[설계환경]에서 "수평지반변형계수","수직지반변형계수"항을 확인해 주시기 바랍니다. 입력값이 보통의 경우 28N을 사용하나 현재 "0"으로 입력이 되어있습니다. 값을 입력하시고 확인하시면 이상이 없습니다. 감사합니다.
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #268560 | Question about the calculation report | 182 | 2026-09-29 |
| Answered | AAbutPier | #268548 | Tendon force when placing tendons in the pier cap | 222 | 2026-09-29 |
| Answered | AAbutPier | #268520 | Pier seismic check | 257 | 2026-09-23 |
| Answered | AAbutPier | #268509 | Transverse reinforcement factor, K | 202 | 2026-09-22 |
| Answered | AAbutPier | #268492 | Girder positions in slab dimensions | 388 | 2026-09-21 |
| Answered | AAbutPier | #268483 | Transverse pile member forces are "0" in pier pile foundation check | 206 | 2026-09-21 |
| Answered | AAbutPier | #268482 | Top and bottom rebar detailing error in pier foundation STM | 227 | 2026-09-21 |
| Answered | AAbutPier | #268476 | Question about slab dimensions | 314 | 2026-09-19 |
| Answered | AAbutPier | #268470 | Settlement and bearing capacity | 275 | 2026-09-18 |
| Answered | AAbutPier | #268462 | Superstructure wind load in the calculation report | 194 | 2026-09-18 |
| Answered | AAbutPier | #268451 | Changing bearing location | 94 | 2026-09-18 |
| Answered | AAbutPier | #268445 | Main rebar placement | 330 | 2026-09-17 |
| Answered | AAbutPier | #268438 | Modeling error in seismic analysis | 415 | 2026-09-17 |
| Answered | AAbutPier | #268433 | Pier alignment center | 190 | 2026-09-17 |
| Answered | AAbutPier | #268431 | Please check the design ground surface displacement | 244 | 2026-09-17 |
| Answered | AAbutPier | #268422 | Question about pier | 278 | 2026-09-17 |
| Answered | AAbutPier | #268416 | Wprov calculation in the structural calculation report | 269 | 2026-09-17 |
| Answered | AAbutPier | #268402 | Increasing the number of column main rebars | 402 | 2026-09-16 |
| Answered | AAbutPier | #268392 | Question about cast-in-place piles | 229 | 2026-09-16 |
| Answered | AAbutPier | #268387 | Error when entering reinforcing rebar | 181 | 2026-09-16 |