Skip to content
AnsweredAAbutPierQ&A #1847222004-02-17 05:58 · Views 69

Rebar quantity issue

두부보의 철근 검토시 코핑폭이 2.7M이고 양쪽피복이100MM이고 배근간격이 100MM이면 철근갯수가 26개이나 28개로 산출됩니다 검토바랍니다

Answer

안녕하세요. 한길아이티입니다. 검토결과 이상없이 출력되고 있습니다. 교각입력의 두부보 배근에서 배근의 간격과 개수를 지정해 주시면 됩니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#268560Question about the calculation report1822026-09-29
AnsweredAAbutPier#268548Tendon force when placing tendons in the pier cap2222026-09-29
AnsweredAAbutPier#268520Pier seismic check2572026-09-23
AnsweredAAbutPier#268509Transverse reinforcement factor, K2022026-09-22
AnsweredAAbutPier#268492Girder positions in slab dimensions3882026-09-21
AnsweredAAbutPier#268483Transverse pile member forces are "0" in pier pile foundation check2062026-09-21
AnsweredAAbutPier#268482Top and bottom rebar detailing error in pier foundation STM2272026-09-21
AnsweredAAbutPier#268476Question about slab dimensions3142026-09-19
AnsweredAAbutPier#268470Settlement and bearing capacity2752026-09-18
AnsweredAAbutPier#268462Superstructure wind load in the calculation report1942026-09-18
AnsweredAAbutPier#268451Changing bearing location942026-09-18
AnsweredAAbutPier#268445Main rebar placement3302026-09-17
AnsweredAAbutPier#268438Modeling error in seismic analysis4152026-09-17
AnsweredAAbutPier#268433Pier alignment center1902026-09-17
AnsweredAAbutPier#268431Please check the design ground surface displacement2442026-09-17
AnsweredAAbutPier#268422Question about pier2782026-09-17
AnsweredAAbutPier#268416Wprov calculation in the structural calculation report2692026-09-17
AnsweredAAbutPier#268402Increasing the number of column main rebars4022026-09-16
AnsweredAAbutPier#268392Question about cast-in-place piles2292026-09-16
AnsweredAAbutPier#268387Error when entering reinforcing rebar1812026-09-16
Sign in to ask