첨부파일에서 예를들면, P5 와 P6 파일기초 반력이 교축기준으로 많은 차이가 나네요. 상단에 걸리는 하중도 비슷한데, 구조계산서를 뜯어보니 말뚝머리 고정일 경우, δx,δy 의 값이 이유없이 크게 차이(약 10배)가 나네요. 이로인해 Combo 2 의 Pn 의 값이 마니 차이가 납니다. 빠른 검토바랍니다.
Answer
안녕하세요. 한길아이티입니다. P5(가동단),P6(고정단)의 말뚝검토시 작용력이 다른 조건으로 되어있습니다. 기초중앙작용력중 모멘트최대의 경우를 확인하시면 됩니다. (P5-COMBO 14, 1477.918-147.403-1795.482 P6-COMBO 4, 1503.039- 11.550- 128.866) 기타 사항은 추가로 검토하고 다른 답변사항이 있으면 추가로 답변드리겠습니다. 감사합니다.
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #268560 | Question about the calculation report | 183 | 2026-09-29 |
| Answered | AAbutPier | #268548 | Tendon force when placing tendons in the pier cap | 223 | 2026-09-29 |
| Answered | AAbutPier | #268520 | Pier seismic check | 258 | 2026-09-23 |
| Answered | AAbutPier | #268509 | Transverse reinforcement factor, K | 204 | 2026-09-22 |
| Answered | AAbutPier | #268492 | Girder positions in slab dimensions | 391 | 2026-09-21 |
| Answered | AAbutPier | #268483 | Transverse pile member forces are "0" in pier pile foundation check | 208 | 2026-09-21 |
| Answered | AAbutPier | #268482 | Top and bottom rebar detailing error in pier foundation STM | 229 | 2026-09-21 |
| Answered | AAbutPier | #268476 | Question about slab dimensions | 317 | 2026-09-19 |
| Answered | AAbutPier | #268470 | Settlement and bearing capacity | 276 | 2026-09-18 |
| Answered | AAbutPier | #268462 | Superstructure wind load in the calculation report | 195 | 2026-09-18 |
| Answered | AAbutPier | #268451 | Changing bearing location | 94 | 2026-09-18 |
| Answered | AAbutPier | #268445 | Main rebar placement | 332 | 2026-09-17 |
| Answered | AAbutPier | #268438 | Modeling error in seismic analysis | 418 | 2026-09-17 |
| Answered | AAbutPier | #268433 | Pier alignment center | 190 | 2026-09-17 |
| Answered | AAbutPier | #268431 | Please check the design ground surface displacement | 244 | 2026-09-17 |
| Answered | AAbutPier | #268422 | Question about pier | 279 | 2026-09-17 |
| Answered | AAbutPier | #268416 | Wprov calculation in the structural calculation report | 269 | 2026-09-17 |
| Answered | AAbutPier | #268402 | Increasing the number of column main rebars | 404 | 2026-09-16 |
| Answered | AAbutPier | #268392 | Question about cast-in-place piles | 230 | 2026-09-16 |
| Answered | AAbutPier | #268387 | Error when entering reinforcing rebar | 182 | 2026-09-16 |