Wing wall length reduced but not reflected in section drawing
날개벽 길이를 줄였는데 단면도에서 줄어들지 않네요 첨부 화일 확인 바랍니다. 단면도에서의 원래 길이가 맞았는데 날개벽 길이를 줄인 다음에는 단면도에서 줄어 들지가 않네요
Answer
안녕하세요. 한길아이티입니다. 질문하신 내용을 정확인 파악이 되지않습니다. 내용을 조금 구체적으로 적어주시거나 전화주시기 바랍니다. ([개인정보],[한길 담당자]) 감사합니다.
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #268560 | Question about the calculation report | 183 | 2026-09-29 |
| Answered | AAbutPier | #268548 | Tendon force when placing tendons in the pier cap | 223 | 2026-09-29 |
| Answered | AAbutPier | #268520 | Pier seismic check | 259 | 2026-09-23 |
| Answered | AAbutPier | #268509 | Transverse reinforcement factor, K | 204 | 2026-09-22 |
| Answered | AAbutPier | #268492 | Girder positions in slab dimensions | 391 | 2026-09-21 |
| Answered | AAbutPier | #268483 | Transverse pile member forces are "0" in pier pile foundation check | 208 | 2026-09-21 |
| Answered | AAbutPier | #268482 | Top and bottom rebar detailing error in pier foundation STM | 229 | 2026-09-21 |
| Answered | AAbutPier | #268476 | Question about slab dimensions | 317 | 2026-09-19 |
| Answered | AAbutPier | #268470 | Settlement and bearing capacity | 276 | 2026-09-18 |
| Answered | AAbutPier | #268462 | Superstructure wind load in the calculation report | 195 | 2026-09-18 |
| Answered | AAbutPier | #268451 | Changing bearing location | 94 | 2026-09-18 |
| Answered | AAbutPier | #268445 | Main rebar placement | 332 | 2026-09-17 |
| Answered | AAbutPier | #268438 | Modeling error in seismic analysis | 418 | 2026-09-17 |
| Answered | AAbutPier | #268433 | Pier alignment center | 190 | 2026-09-17 |
| Answered | AAbutPier | #268431 | Please check the design ground surface displacement | 244 | 2026-09-17 |
| Answered | AAbutPier | #268422 | Question about pier | 279 | 2026-09-17 |
| Answered | AAbutPier | #268416 | Wprov calculation in the structural calculation report | 269 | 2026-09-17 |
| Answered | AAbutPier | #268402 | Increasing the number of column main rebars | 404 | 2026-09-16 |
| Answered | AAbutPier | #268392 | Question about cast-in-place piles | 231 | 2026-09-16 |
| Answered | AAbutPier | #268387 | Error when entering reinforcing rebar | 182 | 2026-09-16 |