Skip to content
AnsweredAAbutPierQ&A #1834512003-11-12 00:08 · Views 52

Slab dimension input

1. 슬래브제원입력 지점2,5에서 셀을 삭제후 수정해도 바뀌지 않습니다. 2. 교대 지반정보입력의 횡단지반입력을 어떻게 사용하는지 알고싶습니다. 부탁드립니다.

Answer

안녕하세요. 한길아이티입니다. 전화로 설명드렸습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#268560Question about the calculation report1832026-09-29
AnsweredAAbutPier#268548Tendon force when placing tendons in the pier cap2232026-09-29
AnsweredAAbutPier#268520Pier seismic check2592026-09-23
AnsweredAAbutPier#268509Transverse reinforcement factor, K2042026-09-22
AnsweredAAbutPier#268492Girder positions in slab dimensions3912026-09-21
AnsweredAAbutPier#268483Transverse pile member forces are "0" in pier pile foundation check2082026-09-21
AnsweredAAbutPier#268482Top and bottom rebar detailing error in pier foundation STM2292026-09-21
AnsweredAAbutPier#268476Question about slab dimensions3172026-09-19
AnsweredAAbutPier#268470Settlement and bearing capacity2772026-09-18
AnsweredAAbutPier#268462Superstructure wind load in the calculation report1952026-09-18
AnsweredAAbutPier#268451Changing bearing location942026-09-18
AnsweredAAbutPier#268445Main rebar placement3322026-09-17
AnsweredAAbutPier#268438Modeling error in seismic analysis4182026-09-17
AnsweredAAbutPier#268433Pier alignment center1902026-09-17
AnsweredAAbutPier#268431Please check the design ground surface displacement2442026-09-17
AnsweredAAbutPier#268422Question about pier2792026-09-17
AnsweredAAbutPier#268416Wprov calculation in the structural calculation report2692026-09-17
AnsweredAAbutPier#268402Increasing the number of column main rebars4042026-09-16
AnsweredAAbutPier#268392Question about cast-in-place piles2322026-09-16
AnsweredAAbutPier#268387Error when entering reinforcing rebar1822026-09-16
Sign in to ask