File error
교좌면 철근후 다음으로 넘어 가지 않고 에러 메세지가 나오면서 다운됩니다.
Answer
안녕하세요. 한길아이티입니다. 다른 PC 및 Win98에서 확인한 바 이상이 없습니다. 파일을 첨부하오니 참고하시기 바랍니다. 감사합니다. 안녕하세요. 한길아이티입니다. 교량받침에 대한 설정이 누락되었습니다. (슈개수가 "0") 확인해 주시기 바랍니다. 감사합니다. 안녕하세요. 한길아이티입니다. 4개의 교대에 모두 설정하여 주시고 출력을 하시면 됩니다. 감사합니다.
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #268560 | Question about the calculation report | 183 | 2026-09-29 |
| Answered | AAbutPier | #268548 | Tendon force when placing tendons in the pier cap | 223 | 2026-09-29 |
| Answered | AAbutPier | #268520 | Pier seismic check | 259 | 2026-09-23 |
| Answered | AAbutPier | #268509 | Transverse reinforcement factor, K | 206 | 2026-09-22 |
| Answered | AAbutPier | #268492 | Girder positions in slab dimensions | 391 | 2026-09-21 |
| Answered | AAbutPier | #268483 | Transverse pile member forces are "0" in pier pile foundation check | 210 | 2026-09-21 |
| Answered | AAbutPier | #268482 | Top and bottom rebar detailing error in pier foundation STM | 229 | 2026-09-21 |
| Answered | AAbutPier | #268476 | Question about slab dimensions | 319 | 2026-09-19 |
| Answered | AAbutPier | #268470 | Settlement and bearing capacity | 277 | 2026-09-18 |
| Answered | AAbutPier | #268462 | Superstructure wind load in the calculation report | 195 | 2026-09-18 |
| Answered | AAbutPier | #268451 | Changing bearing location | 94 | 2026-09-18 |
| Answered | AAbutPier | #268445 | Main rebar placement | 333 | 2026-09-17 |
| Answered | AAbutPier | #268438 | Modeling error in seismic analysis | 419 | 2026-09-17 |
| Answered | AAbutPier | #268433 | Pier alignment center | 191 | 2026-09-17 |
| Answered | AAbutPier | #268431 | Please check the design ground surface displacement | 245 | 2026-09-17 |
| Answered | AAbutPier | #268422 | Question about pier | 279 | 2026-09-17 |
| Answered | AAbutPier | #268416 | Wprov calculation in the structural calculation report | 269 | 2026-09-17 |
| Answered | AAbutPier | #268402 | Increasing the number of column main rebars | 406 | 2026-09-16 |
| Answered | AAbutPier | #268392 | Question about cast-in-place piles | 233 | 2026-09-16 |
| Answered | AAbutPier | #268387 | Error when entering reinforcing rebar | 183 | 2026-09-16 |