일반입력시 상하 거더분리가 되어 있는데 교각 설계환경에서는 받침이 전면(5개소)에만 설치되는걸로 (목포,광양방향 교각1만) 되는지 확인 부탁드립니다.

Answer

안녕하세요. 한길아이티입니다. 정확하게 어떤내용이신지 파악하기 힘듭니다. 직접 연락주시면 답변드리겠습니다. ([전화] : [한길 담당자]) 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#268560Question about the calculation report1832026-09-29
AnsweredAAbutPier#268548Tendon force when placing tendons in the pier cap2232026-09-29
AnsweredAAbutPier#268520Pier seismic check2592026-09-23
AnsweredAAbutPier#268509Transverse reinforcement factor, K2072026-09-22
AnsweredAAbutPier#268492Girder positions in slab dimensions3912026-09-21
AnsweredAAbutPier#268483Transverse pile member forces are "0" in pier pile foundation check2112026-09-21
AnsweredAAbutPier#268482Top and bottom rebar detailing error in pier foundation STM2302026-09-21
AnsweredAAbutPier#268476Question about slab dimensions3202026-09-19
AnsweredAAbutPier#268470Settlement and bearing capacity2772026-09-18
AnsweredAAbutPier#268462Superstructure wind load in the calculation report1952026-09-18
AnsweredAAbutPier#268451Changing bearing location942026-09-18
AnsweredAAbutPier#268445Main rebar placement3332026-09-17
AnsweredAAbutPier#268438Modeling error in seismic analysis4192026-09-17
AnsweredAAbutPier#268433Pier alignment center1922026-09-17
AnsweredAAbutPier#268431Please check the design ground surface displacement2452026-09-17
AnsweredAAbutPier#268422Question about pier2792026-09-17
AnsweredAAbutPier#268416Wprov calculation in the structural calculation report2692026-09-17
AnsweredAAbutPier#268402Increasing the number of column main rebars4062026-09-16
AnsweredAAbutPier#268392Question about cast-in-place piles2332026-09-16
AnsweredAAbutPier#268387Error when entering reinforcing rebar1832026-09-16
Sign in to ask