About abutment drawings
지금 하고 있는 교량이 교대(A1)가 12m이거든요... 그래서.. 교대벽체부 배근이 2단배근되어야 되는데 도면출력시에 모두 1단으로만 배근이 되네요.. 지시선만 나오구.. 배근이 되지 않는듯.. 검토해 주시구요.. 수정 좀 해주세요..^^ 그럼 오늘도 즐거운 하루 보내세요..
Answer
안녕하세요. 한길아이티입니다. 벽체부 2단 배근은 주철근 입력과 전단 및 배력철근 입력에 모두 설정이 되어야 하는데, 현재 주철근 입력에만 설정이 되어있더군요. 일단 임의로 전단 및 배력철근 입력에 입력하여 수정된 파일 첨부해 드립니다. 참고하시구요, 수고하십시오. 감사합니다.
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #268560 | Question about the calculation report | 183 | 2026-09-29 |
| Answered | AAbutPier | #268548 | Tendon force when placing tendons in the pier cap | 223 | 2026-09-29 |
| Answered | AAbutPier | #268520 | Pier seismic check | 259 | 2026-09-23 |
| Answered | AAbutPier | #268509 | Transverse reinforcement factor, K | 207 | 2026-09-22 |
| Answered | AAbutPier | #268492 | Girder positions in slab dimensions | 391 | 2026-09-21 |
| Answered | AAbutPier | #268483 | Transverse pile member forces are "0" in pier pile foundation check | 211 | 2026-09-21 |
| Answered | AAbutPier | #268482 | Top and bottom rebar detailing error in pier foundation STM | 230 | 2026-09-21 |
| Answered | AAbutPier | #268476 | Question about slab dimensions | 320 | 2026-09-19 |
| Answered | AAbutPier | #268470 | Settlement and bearing capacity | 277 | 2026-09-18 |
| Answered | AAbutPier | #268462 | Superstructure wind load in the calculation report | 195 | 2026-09-18 |
| Answered | AAbutPier | #268451 | Changing bearing location | 94 | 2026-09-18 |
| Answered | AAbutPier | #268445 | Main rebar placement | 333 | 2026-09-17 |
| Answered | AAbutPier | #268438 | Modeling error in seismic analysis | 419 | 2026-09-17 |
| Answered | AAbutPier | #268433 | Pier alignment center | 192 | 2026-09-17 |
| Answered | AAbutPier | #268431 | Please check the design ground surface displacement | 245 | 2026-09-17 |
| Answered | AAbutPier | #268422 | Question about pier | 279 | 2026-09-17 |
| Answered | AAbutPier | #268416 | Wprov calculation in the structural calculation report | 269 | 2026-09-17 |
| Answered | AAbutPier | #268402 | Increasing the number of column main rebars | 406 | 2026-09-16 |
| Answered | AAbutPier | #268392 | Question about cast-in-place piles | 233 | 2026-09-16 |
| Answered | AAbutPier | #268387 | Error when entering reinforcing rebar | 183 | 2026-09-16 |