Skip to content
AnsweredAAbutPierQ&A #1825982003-09-26 18:49 · Views 45

Calculation report N.G due to EL error in abutment front view

교대정면도에서 el의 오류로 인한 계산서N.G

Answer

안녕하세요. 한길아이티입니다. 데이타가 이전데이타로 인하여 발생하였으며, 교대 단면도 제원입력에서 도로중심 기준단면 옵션을 클릭하시면 됩니다. 전화로 자세한 답변 드렸습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#268560Question about the calculation report1832026-09-29
AnsweredAAbutPier#268548Tendon force when placing tendons in the pier cap2232026-09-29
AnsweredAAbutPier#268520Pier seismic check2592026-09-23
AnsweredAAbutPier#268509Transverse reinforcement factor, K2072026-09-22
AnsweredAAbutPier#268492Girder positions in slab dimensions3912026-09-21
AnsweredAAbutPier#268483Transverse pile member forces are "0" in pier pile foundation check2112026-09-21
AnsweredAAbutPier#268482Top and bottom rebar detailing error in pier foundation STM2302026-09-21
AnsweredAAbutPier#268476Question about slab dimensions3202026-09-19
AnsweredAAbutPier#268470Settlement and bearing capacity2772026-09-18
AnsweredAAbutPier#268462Superstructure wind load in the calculation report1952026-09-18
AnsweredAAbutPier#268451Changing bearing location942026-09-18
AnsweredAAbutPier#268445Main rebar placement3332026-09-17
AnsweredAAbutPier#268438Modeling error in seismic analysis4192026-09-17
AnsweredAAbutPier#268433Pier alignment center1922026-09-17
AnsweredAAbutPier#268431Please check the design ground surface displacement2452026-09-17
AnsweredAAbutPier#268422Question about pier2792026-09-17
AnsweredAAbutPier#268416Wprov calculation in the structural calculation report2692026-09-17
AnsweredAAbutPier#268402Increasing the number of column main rebars4062026-09-16
AnsweredAAbutPier#268392Question about cast-in-place piles2332026-09-16
AnsweredAAbutPier#268387Error when entering reinforcing rebar1832026-09-16
Sign in to ask