AnsweredAAbutPierQ&A #1823302003-09-06 02:26 · Views 56

Error in pier stability check

교각이 총 8개인데...교각 2와 교각6에서 에러가 발생합니다..검토 부탁 드리겠읍니다.

Answer

안녕하세요. 한길아이티입니다. 수정하였습니다. 패치에 반영하도록 하겠습니다. 19:00이후의 패치를 받으시면 됩니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#268560Question about the calculation report1832026-09-29
AnsweredAAbutPier#268548Tendon force when placing tendons in the pier cap2232026-09-29
AnsweredAAbutPier#268520Pier seismic check2602026-09-23
AnsweredAAbutPier#268509Transverse reinforcement factor, K2072026-09-22
AnsweredAAbutPier#268492Girder positions in slab dimensions3922026-09-21
AnsweredAAbutPier#268483Transverse pile member forces are "0" in pier pile foundation check2132026-09-21
AnsweredAAbutPier#268482Top and bottom rebar detailing error in pier foundation STM2312026-09-21
AnsweredAAbutPier#268476Question about slab dimensions3202026-09-19
AnsweredAAbutPier#268470Settlement and bearing capacity2772026-09-18
AnsweredAAbutPier#268462Superstructure wind load in the calculation report1952026-09-18
AnsweredAAbutPier#268451Changing bearing location942026-09-18
AnsweredAAbutPier#268445Main rebar placement3332026-09-17
AnsweredAAbutPier#268438Modeling error in seismic analysis4192026-09-17
AnsweredAAbutPier#268433Pier alignment center1922026-09-17
AnsweredAAbutPier#268431Please check the design ground surface displacement2452026-09-17
AnsweredAAbutPier#268422Question about pier2792026-09-17
AnsweredAAbutPier#268416Wprov calculation in the structural calculation report2692026-09-17
AnsweredAAbutPier#268402Increasing the number of column main rebars4072026-09-16
AnsweredAAbutPier#268392Question about cast-in-place piles2332026-09-16
AnsweredAAbutPier#268387Error when entering reinforcing rebar1832026-09-16
Sign in to ask