안녕하세요? 첨부한 파일로 작업 중, 교각의 교좌받침 크기 표현이 잘 맞지 않아 문의 드립니다. 교각마다 슈 1~5까지는 맞게 표현되는 것 같은데, 슈 6~10까지의 C1,C2값이 조금씩 틀리게 나옵니다. 확인 부탁드립니다.
Answer
안녕하세요. 한길아이티입니다. 슈1~5의 몰탈높이(50mm)와 6~10의 몰탈높이(41mm)가 서로 상이합니다. 몰탈의 구배는 1:1로 되면 H2의 입력값차이로 C1,C2가 9mm씩 차이가 나고 있습니다. [교각입력]-[교좌면제원]을 확인해 보시기 바랍니다. 감사합니다.
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #268560 | Question about the calculation report | 183 | 2026-09-29 |
| Answered | AAbutPier | #268548 | Tendon force when placing tendons in the pier cap | 223 | 2026-09-29 |
| Answered | AAbutPier | #268520 | Pier seismic check | 260 | 2026-09-23 |
| Answered | AAbutPier | #268509 | Transverse reinforcement factor, K | 207 | 2026-09-22 |
| Answered | AAbutPier | #268492 | Girder positions in slab dimensions | 392 | 2026-09-21 |
| Answered | AAbutPier | #268483 | Transverse pile member forces are "0" in pier pile foundation check | 213 | 2026-09-21 |
| Answered | AAbutPier | #268482 | Top and bottom rebar detailing error in pier foundation STM | 231 | 2026-09-21 |
| Answered | AAbutPier | #268476 | Question about slab dimensions | 320 | 2026-09-19 |
| Answered | AAbutPier | #268470 | Settlement and bearing capacity | 278 | 2026-09-18 |
| Answered | AAbutPier | #268462 | Superstructure wind load in the calculation report | 195 | 2026-09-18 |
| Answered | AAbutPier | #268451 | Changing bearing location | 94 | 2026-09-18 |
| Answered | AAbutPier | #268445 | Main rebar placement | 333 | 2026-09-17 |
| Answered | AAbutPier | #268438 | Modeling error in seismic analysis | 419 | 2026-09-17 |
| Answered | AAbutPier | #268433 | Pier alignment center | 192 | 2026-09-17 |
| Answered | AAbutPier | #268431 | Please check the design ground surface displacement | 245 | 2026-09-17 |
| Answered | AAbutPier | #268422 | Question about pier | 279 | 2026-09-17 |
| Answered | AAbutPier | #268416 | Wprov calculation in the structural calculation report | 269 | 2026-09-17 |
| Answered | AAbutPier | #268402 | Increasing the number of column main rebars | 408 | 2026-09-16 |
| Answered | AAbutPier | #268392 | Question about cast-in-place piles | 233 | 2026-09-16 |
| Answered | AAbutPier | #268387 | Error when entering reinforcing rebar | 183 | 2026-09-16 |