AnsweredAAbutPierQ&A #1820562003-08-14 00:45 · Views 65

Drawings come out corrupted

검토바랍니다.

Answer

안녕하세요. 한길아이티입니다. 데이타 저장시 잘못된 값이 설정되어 있습니다. 금일자 패치를 받으시고 첨부한 파일로 작업을 하시면 됩니다. 혹시 같은 현상이 있는 다른 파일이 있으시면 게시판에 올리시거나 전화 ([전화],[한길 담당자])주시기 바랍니다. 감사합니다.

Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#268560Question about the calculation report1832026-09-29
AnsweredAAbutPier#268548Tendon force when placing tendons in the pier cap2232026-09-29
AnsweredAAbutPier#268520Pier seismic check2612026-09-23
AnsweredAAbutPier#268509Transverse reinforcement factor, K2072026-09-22
AnsweredAAbutPier#268492Girder positions in slab dimensions3932026-09-21
AnsweredAAbutPier#268483Transverse pile member forces are "0" in pier pile foundation check2132026-09-21
AnsweredAAbutPier#268482Top and bottom rebar detailing error in pier foundation STM2312026-09-21
AnsweredAAbutPier#268476Question about slab dimensions3202026-09-19
AnsweredAAbutPier#268470Settlement and bearing capacity2792026-09-18
AnsweredAAbutPier#268462Superstructure wind load in the calculation report1952026-09-18
AnsweredAAbutPier#268451Changing bearing location942026-09-18
AnsweredAAbutPier#268445Main rebar placement3332026-09-17
AnsweredAAbutPier#268438Modeling error in seismic analysis4192026-09-17
AnsweredAAbutPier#268433Pier alignment center1922026-09-17
AnsweredAAbutPier#268431Please check the design ground surface displacement2452026-09-17
AnsweredAAbutPier#268422Question about pier2792026-09-17
AnsweredAAbutPier#268416Wprov calculation in the structural calculation report2692026-09-17
AnsweredAAbutPier#268402Increasing the number of column main rebars4092026-09-16
AnsweredAAbutPier#268392Question about cast-in-place piles2332026-09-16
AnsweredAAbutPier#268387Error when entering reinforcing rebar1842026-09-16
Sign in to ask