AnsweredAAbutPierQ&A #1817632003-07-29 19:58 · Views 60

Drawings cannot be output

어제까지 잘됬는데 . 이상하게 오늘 돌려서 dxf파일로 저장했는데 캐드에서 불려들여지지가 않습니다. Fatal error:unhandled acess violation reading ox4d76ab58 exception at 78010bd8h 란 메세지가 나오면서 도면이 캐드에서 안불려들여집니다.

Answer

안녕하세요. 한길아이티입니다. 현재 확인한 결과 이상없습니다. 2시 이후 패치를 한번 받아보시기 바랍니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#268560Question about the calculation report1832026-09-29
AnsweredAAbutPier#268548Tendon force when placing tendons in the pier cap2232026-09-29
AnsweredAAbutPier#268520Pier seismic check2612026-09-23
AnsweredAAbutPier#268509Transverse reinforcement factor, K2082026-09-22
AnsweredAAbutPier#268492Girder positions in slab dimensions3952026-09-21
AnsweredAAbutPier#268483Transverse pile member forces are "0" in pier pile foundation check2132026-09-21
AnsweredAAbutPier#268482Top and bottom rebar detailing error in pier foundation STM2312026-09-21
AnsweredAAbutPier#268476Question about slab dimensions3202026-09-19
AnsweredAAbutPier#268470Settlement and bearing capacity2792026-09-18
AnsweredAAbutPier#268462Superstructure wind load in the calculation report1952026-09-18
AnsweredAAbutPier#268451Changing bearing location942026-09-18
AnsweredAAbutPier#268445Main rebar placement3332026-09-17
AnsweredAAbutPier#268438Modeling error in seismic analysis4192026-09-17
AnsweredAAbutPier#268433Pier alignment center1922026-09-17
AnsweredAAbutPier#268431Please check the design ground surface displacement2452026-09-17
AnsweredAAbutPier#268422Question about pier2792026-09-17
AnsweredAAbutPier#268416Wprov calculation in the structural calculation report2722026-09-17
AnsweredAAbutPier#268402Increasing the number of column main rebars4092026-09-16
AnsweredAAbutPier#268392Question about cast-in-place piles2332026-09-16
AnsweredAAbutPier#268387Error when entering reinforcing rebar1842026-09-16
Sign in to ask