Abutment section dimension step in apier
안녕하세요.. apier에서 교대 단면도 제원단계에서 도로중심기준 단면 체크 박스를 어떻게 하면 활성화 되는지요? 교대 센터 단면으로 교대 정면도를 그리고 싶은데 하행선(광양방향)쪽이 제어가 안되네요.. 파일도 첨부했습니다..
Answer
안녕하세요. 한길아이티입니다. 교대단면도 입력에서 체크박스를 선택하시고 정면도에서 설정을 해주시면 됩니다. 확인한 바 4개의 교대 모두 이상이 없습니다. 감사합니다.
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #268560 | Question about the calculation report | 183 | 2026-09-29 |
| Answered | AAbutPier | #268548 | Tendon force when placing tendons in the pier cap | 223 | 2026-09-29 |
| Answered | AAbutPier | #268520 | Pier seismic check | 263 | 2026-09-23 |
| Answered | AAbutPier | #268509 | Transverse reinforcement factor, K | 208 | 2026-09-22 |
| Answered | AAbutPier | #268492 | Girder positions in slab dimensions | 395 | 2026-09-21 |
| Answered | AAbutPier | #268483 | Transverse pile member forces are "0" in pier pile foundation check | 213 | 2026-09-21 |
| Answered | AAbutPier | #268482 | Top and bottom rebar detailing error in pier foundation STM | 231 | 2026-09-21 |
| Answered | AAbutPier | #268476 | Question about slab dimensions | 320 | 2026-09-19 |
| Answered | AAbutPier | #268470 | Settlement and bearing capacity | 279 | 2026-09-18 |
| Answered | AAbutPier | #268462 | Superstructure wind load in the calculation report | 196 | 2026-09-18 |
| Answered | AAbutPier | #268451 | Changing bearing location | 94 | 2026-09-18 |
| Answered | AAbutPier | #268445 | Main rebar placement | 333 | 2026-09-17 |
| Answered | AAbutPier | #268438 | Modeling error in seismic analysis | 419 | 2026-09-17 |
| Answered | AAbutPier | #268433 | Pier alignment center | 192 | 2026-09-17 |
| Answered | AAbutPier | #268431 | Please check the design ground surface displacement | 245 | 2026-09-17 |
| Answered | AAbutPier | #268422 | Question about pier | 279 | 2026-09-17 |
| Answered | AAbutPier | #268416 | Wprov calculation in the structural calculation report | 273 | 2026-09-17 |
| Answered | AAbutPier | #268402 | Increasing the number of column main rebars | 409 | 2026-09-16 |
| Answered | AAbutPier | #268392 | Question about cast-in-place piles | 233 | 2026-09-16 |
| Answered | AAbutPier | #268387 | Error when entering reinforcing rebar | 184 | 2026-09-16 |