AnsweredAAbutPierQ&A #2093162007-12-14 10:20 · Views 53

Question in Korean (English title coming soon)

부득이 하게 교대 전면에 날개벽 설치중... 철근 배근이 안되는데요.. 검토 바랍니다.

Answer

안녕하세요. 한길아이티입니다. 올려주신 파일의 교대입력-전단 및 배력철근 에서 우측날개벽의 입력이 누락되어 철근이 생성되지 않았습니다. 입력하시고, 철근제원에서 권고안 실행하신후 도면 생성하시면 됩니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#268560Question about the calculation report1782026-09-29
AnsweredAAbutPier#268548Tendon force when placing tendons in the pier cap2132026-09-29
AnsweredAAbutPier#268520Pier seismic check2422026-09-23
AnsweredAAbutPier#268509Transverse reinforcement factor, K1902026-09-22
AnsweredAAbutPier#268492Girder positions in slab dimensions3302026-09-21
AnsweredAAbutPier#268483Transverse pile member forces are "0" in pier pile foundation check1982026-09-21
AnsweredAAbutPier#268482Top and bottom rebar detailing error in pier foundation STM2152026-09-21
AnsweredAAbutPier#268476Question about slab dimensions3002026-09-19
AnsweredAAbutPier#268470Settlement and bearing capacity2632026-09-18
AnsweredAAbutPier#268462Superstructure wind load in the calculation report1892026-09-18
AnsweredAAbutPier#268451Changing bearing location862026-09-18
AnsweredAAbutPier#268445Main rebar placement2592026-09-17
AnsweredAAbutPier#268438Modeling error in seismic analysis3972026-09-17
AnsweredAAbutPier#268433Pier alignment center1862026-09-17
AnsweredAAbutPier#268431Please check the design ground surface displacement2172026-09-17
AnsweredAAbutPier#268422Question about pier2442026-09-17
AnsweredAAbutPier#268416Wprov calculation in the structural calculation report2322026-09-17
AnsweredAAbutPier#268402Increasing the number of column main rebars3822026-09-16
AnsweredAAbutPier#268392Question about cast-in-place piles2172026-09-16
AnsweredAAbutPier#268387Error when entering reinforcing rebar1702026-09-16
Sign in to ask