Question in Korean (English title coming soon)
교량기본설정을 몇가지 수정한 후 교량기본설정 입력란에서 다음 단계로 넘어가는데 구동시간이 너무 오래 걸립니다.
Answer
안녕하세요. 한길아이티입니다. 교량 기본설정부분을 수정을 하게 되면 교량의 기본적인 부분들이 바뀌게 되므로 모든 정보를 갱신하게 됩니다. 그러한 부분때문에 프로그램이 느려질수 있습니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #268560 | Question about the calculation report | 178 | 2026-09-29 |
| Answered | AAbutPier | #268548 | Tendon force when placing tendons in the pier cap | 213 | 2026-09-29 |
| Answered | AAbutPier | #268520 | Pier seismic check | 242 | 2026-09-23 |
| Answered | AAbutPier | #268509 | Transverse reinforcement factor, K | 190 | 2026-09-22 |
| Answered | AAbutPier | #268492 | Girder positions in slab dimensions | 330 | 2026-09-21 |
| Answered | AAbutPier | #268483 | Transverse pile member forces are "0" in pier pile foundation check | 198 | 2026-09-21 |
| Answered | AAbutPier | #268482 | Top and bottom rebar detailing error in pier foundation STM | 215 | 2026-09-21 |
| Answered | AAbutPier | #268476 | Question about slab dimensions | 300 | 2026-09-19 |
| Answered | AAbutPier | #268470 | Settlement and bearing capacity | 263 | 2026-09-18 |
| Answered | AAbutPier | #268462 | Superstructure wind load in the calculation report | 189 | 2026-09-18 |
| Answered | AAbutPier | #268451 | Changing bearing location | 86 | 2026-09-18 |
| Answered | AAbutPier | #268445 | Main rebar placement | 259 | 2026-09-17 |
| Answered | AAbutPier | #268438 | Modeling error in seismic analysis | 397 | 2026-09-17 |
| Answered | AAbutPier | #268433 | Pier alignment center | 186 | 2026-09-17 |
| Answered | AAbutPier | #268431 | Please check the design ground surface displacement | 217 | 2026-09-17 |
| Answered | AAbutPier | #268422 | Question about pier | 244 | 2026-09-17 |
| Answered | AAbutPier | #268416 | Wprov calculation in the structural calculation report | 232 | 2026-09-17 |
| Answered | AAbutPier | #268402 | Increasing the number of column main rebars | 382 | 2026-09-16 |
| Answered | AAbutPier | #268392 | Question about cast-in-place piles | 217 | 2026-09-16 |
| Answered | AAbutPier | #268387 | Error when entering reinforcing rebar | 170 | 2026-09-16 |