Question in Korean (English title coming soon)
2003과2007이 교대 교좌받침 위치가 약간 차이가 나네요 확인부탁드립니다
Follow-up2007-12-10 15:22
또한 교대날개벽 EL값이 서로 상이합니다 확인부탁드립니다 >2003과2007이 교대 교좌받침 위치가 약간 차이가 나네요 확인부탁드립니다
Answer2007-12-12 09:09
안녕하세요. 한길아이티입니다. 곡선 사교 교량에 교대추가길이 포함된 경우 날개벽 EL 자동 계산부분의 오류를 수정하여 패치적용하였습니다. 감사합니다.
Answer2007-12-12 11:24
안녕하세요. 한길아이티입니다. 전화로 말씀드렸으며, 교량기본설정-지점각도-교량받침좌표편집-사용자입력좌표사용 체크 해제시 곡선사교의 교좌간 거리는 교량기본설정-횡단구성에 입력한 거리를 기준으로 표시하도록 수정하여 금일중에 패치하겠습니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #268560 | Question about the calculation report | 178 | 2026-09-29 |
| Answered | AAbutPier | #268548 | Tendon force when placing tendons in the pier cap | 213 | 2026-09-29 |
| Answered | AAbutPier | #268520 | Pier seismic check | 242 | 2026-09-23 |
| Answered | AAbutPier | #268509 | Transverse reinforcement factor, K | 190 | 2026-09-22 |
| Answered | AAbutPier | #268492 | Girder positions in slab dimensions | 330 | 2026-09-21 |
| Answered | AAbutPier | #268483 | Transverse pile member forces are "0" in pier pile foundation check | 198 | 2026-09-21 |
| Answered | AAbutPier | #268482 | Top and bottom rebar detailing error in pier foundation STM | 215 | 2026-09-21 |
| Answered | AAbutPier | #268476 | Question about slab dimensions | 300 | 2026-09-19 |
| Answered | AAbutPier | #268470 | Settlement and bearing capacity | 263 | 2026-09-18 |
| Answered | AAbutPier | #268462 | Superstructure wind load in the calculation report | 189 | 2026-09-18 |
| Answered | AAbutPier | #268451 | Changing bearing location | 87 | 2026-09-18 |
| Answered | AAbutPier | #268445 | Main rebar placement | 259 | 2026-09-17 |
| Answered | AAbutPier | #268438 | Modeling error in seismic analysis | 397 | 2026-09-17 |
| Answered | AAbutPier | #268433 | Pier alignment center | 186 | 2026-09-17 |
| Answered | AAbutPier | #268431 | Please check the design ground surface displacement | 217 | 2026-09-17 |
| Answered | AAbutPier | #268422 | Question about pier | 244 | 2026-09-17 |
| Answered | AAbutPier | #268416 | Wprov calculation in the structural calculation report | 232 | 2026-09-17 |
| Answered | AAbutPier | #268402 | Increasing the number of column main rebars | 382 | 2026-09-16 |
| Answered | AAbutPier | #268392 | Question about cast-in-place piles | 217 | 2026-09-16 |
| Answered | AAbutPier | #268387 | Error when entering reinforcing rebar | 170 | 2026-09-16 |