AnsweredAAbutPierQ&A #2090142007-12-05 10:14 · Views 37

Question in Korean (English title coming soon)

상부에서 불러온 것이 아니고 직접 입력 하였습니다. 상, 하행선 교대 표현이 A1, A2....P1, P2 이렇게 됩니다. 검토 바랍니다.

Answer

안녕하세요. 한길아이티입니다. 일반입력-교량받침 위치 입력에서 지점명을 수정할 수 있게 작업하여 금일중에 패치적용하겠습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#268560Question about the calculation report1782026-09-29
AnsweredAAbutPier#268548Tendon force when placing tendons in the pier cap2132026-09-29
AnsweredAAbutPier#268520Pier seismic check2422026-09-23
AnsweredAAbutPier#268509Transverse reinforcement factor, K1902026-09-22
AnsweredAAbutPier#268492Girder positions in slab dimensions3302026-09-21
AnsweredAAbutPier#268483Transverse pile member forces are "0" in pier pile foundation check1982026-09-21
AnsweredAAbutPier#268482Top and bottom rebar detailing error in pier foundation STM2152026-09-21
AnsweredAAbutPier#268476Question about slab dimensions3002026-09-19
AnsweredAAbutPier#268470Settlement and bearing capacity2632026-09-18
AnsweredAAbutPier#268462Superstructure wind load in the calculation report1892026-09-18
AnsweredAAbutPier#268451Changing bearing location872026-09-18
AnsweredAAbutPier#268445Main rebar placement2592026-09-17
AnsweredAAbutPier#268438Modeling error in seismic analysis3972026-09-17
AnsweredAAbutPier#268433Pier alignment center1862026-09-17
AnsweredAAbutPier#268431Please check the design ground surface displacement2172026-09-17
AnsweredAAbutPier#268422Question about pier2442026-09-17
AnsweredAAbutPier#268416Wprov calculation in the structural calculation report2322026-09-17
AnsweredAAbutPier#268402Increasing the number of column main rebars3822026-09-16
AnsweredAAbutPier#268392Question about cast-in-place piles2172026-09-16
AnsweredAAbutPier#268387Error when entering reinforcing rebar1702026-09-16
Sign in to ask