1.날개벽제원에서 교대전면 날개벽 설치일때 기초폭이 5m인데 날개벽 배근도 출력창에는 5.3m로 표기되는데 검토부탁드립니다. 2.화일은 아래 질문(32136번) 참조하면 됩니다.

Answer

안녕하세요. 한길아이티입니다. 출력부분의 오류를 수정하여 금일중에 패치하겠습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#268560Question about the calculation report1782026-09-29
AnsweredAAbutPier#268548Tendon force when placing tendons in the pier cap2132026-09-29
AnsweredAAbutPier#268520Pier seismic check2422026-09-23
AnsweredAAbutPier#268509Transverse reinforcement factor, K1902026-09-22
AnsweredAAbutPier#268492Girder positions in slab dimensions3302026-09-21
AnsweredAAbutPier#268483Transverse pile member forces are "0" in pier pile foundation check1982026-09-21
AnsweredAAbutPier#268482Top and bottom rebar detailing error in pier foundation STM2152026-09-21
AnsweredAAbutPier#268476Question about slab dimensions3012026-09-19
AnsweredAAbutPier#268470Settlement and bearing capacity2642026-09-18
AnsweredAAbutPier#268462Superstructure wind load in the calculation report1892026-09-18
AnsweredAAbutPier#268451Changing bearing location872026-09-18
AnsweredAAbutPier#268445Main rebar placement2612026-09-17
AnsweredAAbutPier#268438Modeling error in seismic analysis3982026-09-17
AnsweredAAbutPier#268433Pier alignment center1862026-09-17
AnsweredAAbutPier#268431Please check the design ground surface displacement2182026-09-17
AnsweredAAbutPier#268422Question about pier2452026-09-17
AnsweredAAbutPier#268416Wprov calculation in the structural calculation report2322026-09-17
AnsweredAAbutPier#268402Increasing the number of column main rebars3822026-09-16
AnsweredAAbutPier#268392Question about cast-in-place piles2182026-09-16
AnsweredAAbutPier#268387Error when entering reinforcing rebar1702026-09-16
Sign in to ask