Question in Korean (English title coming soon)
바쁘실텐데 죄송합니다. 처음 프로그램을 접하다 보니 질문사항이 많네요 다름이 아니라 교각 기둥부 주철근 입력에서 설계검토를 하면 Pu를 죄외한 나머지 값들이 다 0으로 나오고 PM상관도 보기를 체크하면 프로그램이 다운이 됩니다. 제가 교각3개를 입력했는데 1나는 되고 나머지 2개에서 이런 문제가 생기네요(P1-9는 정상이고, P16-18,P31-3에서 오류가 생기네요) 참고고 최신버전으로 다운받은 다음 했는데도 오류가 생기네요. 검토좀 부탁드립니다. 수고하세요
Answer
안녕하세요. 한길아이티입니다. 단면쪽에서 출력오류가 있었습니다. 수정하여 금일중 패치하겠습니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #268560 | Question about the calculation report | 178 | 2026-09-29 |
| Answered | AAbutPier | #268548 | Tendon force when placing tendons in the pier cap | 213 | 2026-09-29 |
| Answered | AAbutPier | #268520 | Pier seismic check | 242 | 2026-09-23 |
| Answered | AAbutPier | #268509 | Transverse reinforcement factor, K | 190 | 2026-09-22 |
| Answered | AAbutPier | #268492 | Girder positions in slab dimensions | 330 | 2026-09-21 |
| Answered | AAbutPier | #268483 | Transverse pile member forces are "0" in pier pile foundation check | 198 | 2026-09-21 |
| Answered | AAbutPier | #268482 | Top and bottom rebar detailing error in pier foundation STM | 215 | 2026-09-21 |
| Answered | AAbutPier | #268476 | Question about slab dimensions | 301 | 2026-09-19 |
| Answered | AAbutPier | #268470 | Settlement and bearing capacity | 264 | 2026-09-18 |
| Answered | AAbutPier | #268462 | Superstructure wind load in the calculation report | 189 | 2026-09-18 |
| Answered | AAbutPier | #268451 | Changing bearing location | 87 | 2026-09-18 |
| Answered | AAbutPier | #268445 | Main rebar placement | 261 | 2026-09-17 |
| Answered | AAbutPier | #268438 | Modeling error in seismic analysis | 398 | 2026-09-17 |
| Answered | AAbutPier | #268433 | Pier alignment center | 186 | 2026-09-17 |
| Answered | AAbutPier | #268431 | Please check the design ground surface displacement | 220 | 2026-09-17 |
| Answered | AAbutPier | #268422 | Question about pier | 246 | 2026-09-17 |
| Answered | AAbutPier | #268416 | Wprov calculation in the structural calculation report | 233 | 2026-09-17 |
| Answered | AAbutPier | #268402 | Increasing the number of column main rebars | 382 | 2026-09-16 |
| Answered | AAbutPier | #268392 | Question about cast-in-place piles | 218 | 2026-09-16 |
| Answered | AAbutPier | #268387 | Error when entering reinforcing rebar | 170 | 2026-09-16 |