Question in Korean (English title coming soon)
교각3, 4번 거푸집(7~10m)수량이 (-)값이 나옵니다.. 검토부탁드립니다..
Follow-up2007-11-19 11:56
또한, 교각3, 4번 코핑 주인장철근을 2단배근시 2단철근에서 100mm떨어져 축방향 철근이 배치되어야 하는데 2단철근과 축방향철근이 맞닿아 배치됨
Answer2007-11-19 13:21
안녕하세요. 한길아이티입니다. 교각입력-설계환경-설계선택사항-기둥-기둥축방향철근-상부연장기준에서 두부보 상면 2단(3단) 주철근 선택하셔야 합니다. 또한 이격거리에 100mm로 입력시 정상적으로 출력가능합니다. 감사합니다.
Answer2007-11-19 17:36
안녕하세요. 한길아이티입니다. 출력부분의 오류를 수정하여 금일중 패치하겠습니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #268560 | Question about the calculation report | 178 | 2026-09-29 |
| Answered | AAbutPier | #268548 | Tendon force when placing tendons in the pier cap | 213 | 2026-09-29 |
| Answered | AAbutPier | #268520 | Pier seismic check | 242 | 2026-09-23 |
| Answered | AAbutPier | #268509 | Transverse reinforcement factor, K | 190 | 2026-09-22 |
| Answered | AAbutPier | #268492 | Girder positions in slab dimensions | 330 | 2026-09-21 |
| Answered | AAbutPier | #268483 | Transverse pile member forces are "0" in pier pile foundation check | 198 | 2026-09-21 |
| Answered | AAbutPier | #268482 | Top and bottom rebar detailing error in pier foundation STM | 215 | 2026-09-21 |
| Answered | AAbutPier | #268476 | Question about slab dimensions | 301 | 2026-09-19 |
| Answered | AAbutPier | #268470 | Settlement and bearing capacity | 264 | 2026-09-18 |
| Answered | AAbutPier | #268462 | Superstructure wind load in the calculation report | 189 | 2026-09-18 |
| Answered | AAbutPier | #268451 | Changing bearing location | 87 | 2026-09-18 |
| Answered | AAbutPier | #268445 | Main rebar placement | 261 | 2026-09-17 |
| Answered | AAbutPier | #268438 | Modeling error in seismic analysis | 398 | 2026-09-17 |
| Answered | AAbutPier | #268433 | Pier alignment center | 186 | 2026-09-17 |
| Answered | AAbutPier | #268431 | Please check the design ground surface displacement | 220 | 2026-09-17 |
| Answered | AAbutPier | #268422 | Question about pier | 246 | 2026-09-17 |
| Answered | AAbutPier | #268416 | Wprov calculation in the structural calculation report | 233 | 2026-09-17 |
| Answered | AAbutPier | #268402 | Increasing the number of column main rebars | 382 | 2026-09-16 |
| Answered | AAbutPier | #268392 | Question about cast-in-place piles | 218 | 2026-09-16 |
| Answered | AAbutPier | #268387 | Error when entering reinforcing rebar | 170 | 2026-09-16 |