Lap splice display for pier column main rebar
교각배근도에서 주철근의 겹이음표시는 표현이 안되나요? 표현이 된다면 설계시 커플러설치구간에서의 겹이음은 피해서 표시가 됩니까?
Answer
안녕하세요. 한길아이티입니다. 교각배근도에서 기둥주철근의 겹이음 표현은 되고 있지 않습니다. 철근상세에서만 겹이음의 숫자를 더해서 길이를 산정하고 있습니다. 또한 겹이음과 커플러를 동시에 쓰신다는 부분은 지원이 되고 있지 않은 사항입니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #268560 | Question about the calculation report | 178 | 2026-09-29 |
| Answered | AAbutPier | #268548 | Tendon force when placing tendons in the pier cap | 213 | 2026-09-29 |
| Answered | AAbutPier | #268520 | Pier seismic check | 243 | 2026-09-23 |
| Answered | AAbutPier | #268509 | Transverse reinforcement factor, K | 190 | 2026-09-22 |
| Answered | AAbutPier | #268492 | Girder positions in slab dimensions | 331 | 2026-09-21 |
| Answered | AAbutPier | #268483 | Transverse pile member forces are "0" in pier pile foundation check | 198 | 2026-09-21 |
| Answered | AAbutPier | #268482 | Top and bottom rebar detailing error in pier foundation STM | 215 | 2026-09-21 |
| Answered | AAbutPier | #268476 | Question about slab dimensions | 301 | 2026-09-19 |
| Answered | AAbutPier | #268470 | Settlement and bearing capacity | 264 | 2026-09-18 |
| Answered | AAbutPier | #268462 | Superstructure wind load in the calculation report | 189 | 2026-09-18 |
| Answered | AAbutPier | #268451 | Changing bearing location | 87 | 2026-09-18 |
| Answered | AAbutPier | #268445 | Main rebar placement | 262 | 2026-09-17 |
| Answered | AAbutPier | #268438 | Modeling error in seismic analysis | 399 | 2026-09-17 |
| Answered | AAbutPier | #268433 | Pier alignment center | 186 | 2026-09-17 |
| Answered | AAbutPier | #268431 | Please check the design ground surface displacement | 220 | 2026-09-17 |
| Answered | AAbutPier | #268422 | Question about pier | 246 | 2026-09-17 |
| Answered | AAbutPier | #268416 | Wprov calculation in the structural calculation report | 234 | 2026-09-17 |
| Answered | AAbutPier | #268402 | Increasing the number of column main rebars | 382 | 2026-09-16 |
| Answered | AAbutPier | #268392 | Question about cast-in-place piles | 219 | 2026-09-16 |
| Answered | AAbutPier | #268387 | Error when entering reinforcing rebar | 170 | 2026-09-16 |