AnsweredAAbutPierQ&A #2080132007-11-07 09:28 · Views 38

Abutment earthwork sketch error

수고하십니다 교대토공수량 옵션에서 eps블럭을 해제하고 수량산출서를 출력하면 삽도에 eps블럭그림이 표시되고 터파기 구배에 불필요한 선들이 표시됩니다. 확인바랍니다 그리고 31424질문 진행사항도 알고싶네요

Answer

안녕하세요. 한길아이티입니다. 수정하여 금일중 패치하겠습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#268560Question about the calculation report1782026-09-29
AnsweredAAbutPier#268548Tendon force when placing tendons in the pier cap2142026-09-29
AnsweredAAbutPier#268520Pier seismic check2442026-09-23
AnsweredAAbutPier#268509Transverse reinforcement factor, K1902026-09-22
AnsweredAAbutPier#268492Girder positions in slab dimensions3312026-09-21
AnsweredAAbutPier#268483Transverse pile member forces are "0" in pier pile foundation check1982026-09-21
AnsweredAAbutPier#268482Top and bottom rebar detailing error in pier foundation STM2152026-09-21
AnsweredAAbutPier#268476Question about slab dimensions3012026-09-19
AnsweredAAbutPier#268470Settlement and bearing capacity2642026-09-18
AnsweredAAbutPier#268462Superstructure wind load in the calculation report1892026-09-18
AnsweredAAbutPier#268451Changing bearing location872026-09-18
AnsweredAAbutPier#268445Main rebar placement2622026-09-17
AnsweredAAbutPier#268438Modeling error in seismic analysis3992026-09-17
AnsweredAAbutPier#268433Pier alignment center1862026-09-17
AnsweredAAbutPier#268431Please check the design ground surface displacement2212026-09-17
AnsweredAAbutPier#268422Question about pier2472026-09-17
AnsweredAAbutPier#268416Wprov calculation in the structural calculation report2342026-09-17
AnsweredAAbutPier#268402Increasing the number of column main rebars3822026-09-16
AnsweredAAbutPier#268392Question about cast-in-place piles2192026-09-16
AnsweredAAbutPier#268387Error when entering reinforcing rebar1712026-09-16
Sign in to ask