Display error for confinement rebar and regular ties
1.기둥띠철근 입력시 나타나는 기둥(M1)과 심부구속철근(M1)의 철근마킹은 동일하나 실제도면의 기둥철근(P1,P2)과 심부구속철근(P3)의 마킹은 다르게 표현되어 집니다. 그러나 심부구속철근(P3,D25)과 일반기둥띠철근(P3.D19)의 마킹이 서로 다른 직경을 사용함에도 불구 하고 같은 마킹번호를 사용하고 있슴. 검토 바람니다.
Answer
안녕하세요. 한길아이티입니다. 철근마킹 중복부분을 수정하여 금일중 패치하겠습니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #268560 | Question about the calculation report | 178 | 2026-09-29 |
| Answered | AAbutPier | #268548 | Tendon force when placing tendons in the pier cap | 215 | 2026-09-29 |
| Answered | AAbutPier | #268520 | Pier seismic check | 244 | 2026-09-23 |
| Answered | AAbutPier | #268509 | Transverse reinforcement factor, K | 191 | 2026-09-22 |
| Answered | AAbutPier | #268492 | Girder positions in slab dimensions | 331 | 2026-09-21 |
| Answered | AAbutPier | #268483 | Transverse pile member forces are "0" in pier pile foundation check | 198 | 2026-09-21 |
| Answered | AAbutPier | #268482 | Top and bottom rebar detailing error in pier foundation STM | 215 | 2026-09-21 |
| Answered | AAbutPier | #268476 | Question about slab dimensions | 302 | 2026-09-19 |
| Answered | AAbutPier | #268470 | Settlement and bearing capacity | 266 | 2026-09-18 |
| Answered | AAbutPier | #268462 | Superstructure wind load in the calculation report | 189 | 2026-09-18 |
| Answered | AAbutPier | #268451 | Changing bearing location | 87 | 2026-09-18 |
| Answered | AAbutPier | #268445 | Main rebar placement | 262 | 2026-09-17 |
| Answered | AAbutPier | #268438 | Modeling error in seismic analysis | 400 | 2026-09-17 |
| Answered | AAbutPier | #268433 | Pier alignment center | 186 | 2026-09-17 |
| Answered | AAbutPier | #268431 | Please check the design ground surface displacement | 221 | 2026-09-17 |
| Answered | AAbutPier | #268422 | Question about pier | 247 | 2026-09-17 |
| Answered | AAbutPier | #268416 | Wprov calculation in the structural calculation report | 234 | 2026-09-17 |
| Answered | AAbutPier | #268402 | Increasing the number of column main rebars | 382 | 2026-09-16 |
| Answered | AAbutPier | #268392 | Question about cast-in-place piles | 219 | 2026-09-16 |
| Answered | AAbutPier | #268387 | Error when entering reinforcing rebar | 171 | 2026-09-16 |