About foundation reinforcement detailing

교각 기초부 배근에서 교직방향 2cycle 철근 압축부 제거에서 철근 연결이 클릭해도 변하지 않습니다.

Answer

안녕하세요. 한길아이티입니다. 수정하여 금일중으로 패치하겠습니다. 패치하시고 파일을 여시면 교각- 단면도제원을 한번 거쳐오셔야만 수정된 사항이 적용됩니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#268560Question about the calculation report1782026-09-29
AnsweredAAbutPier#268548Tendon force when placing tendons in the pier cap2142026-09-29
AnsweredAAbutPier#268520Pier seismic check2442026-09-23
AnsweredAAbutPier#268509Transverse reinforcement factor, K1902026-09-22
AnsweredAAbutPier#268492Girder positions in slab dimensions3312026-09-21
AnsweredAAbutPier#268483Transverse pile member forces are "0" in pier pile foundation check1982026-09-21
AnsweredAAbutPier#268482Top and bottom rebar detailing error in pier foundation STM2152026-09-21
AnsweredAAbutPier#268476Question about slab dimensions3012026-09-19
AnsweredAAbutPier#268470Settlement and bearing capacity2642026-09-18
AnsweredAAbutPier#268462Superstructure wind load in the calculation report1892026-09-18
AnsweredAAbutPier#268451Changing bearing location872026-09-18
AnsweredAAbutPier#268445Main rebar placement2622026-09-17
AnsweredAAbutPier#268438Modeling error in seismic analysis3992026-09-17
AnsweredAAbutPier#268433Pier alignment center1862026-09-17
AnsweredAAbutPier#268431Please check the design ground surface displacement2212026-09-17
AnsweredAAbutPier#268422Question about pier2472026-09-17
AnsweredAAbutPier#268416Wprov calculation in the structural calculation report2342026-09-17
AnsweredAAbutPier#268402Increasing the number of column main rebars3822026-09-16
AnsweredAAbutPier#268392Question about cast-in-place piles2192026-09-16
AnsweredAAbutPier#268387Error when entering reinforcing rebar1712026-09-16
Sign in to ask