Separation distance between up and down lines

상하행 분리형 교량입니다.. 상부는 상하행 이격거리가 20mm이지만 교대는 10mm두는데 APier에서는 이격거리가 상부와 같이 20mm적용됩니다.. 10mm 이격거리적용 옵션이 따로 있는지요?

Answer

안녕하세요. 한길아이티입니다. 시점 및 횡단구성 입력 부분에서 상하행에 10mm떨어지게 입력하시면 교대폭원이 질의하신대로 됩니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#268560Question about the calculation report1792026-09-29
AnsweredAAbutPier#268548Tendon force when placing tendons in the pier cap2152026-09-29
AnsweredAAbutPier#268520Pier seismic check2442026-09-23
AnsweredAAbutPier#268509Transverse reinforcement factor, K1912026-09-22
AnsweredAAbutPier#268492Girder positions in slab dimensions3312026-09-21
AnsweredAAbutPier#268483Transverse pile member forces are "0" in pier pile foundation check1982026-09-21
AnsweredAAbutPier#268482Top and bottom rebar detailing error in pier foundation STM2152026-09-21
AnsweredAAbutPier#268476Question about slab dimensions3032026-09-19
AnsweredAAbutPier#268470Settlement and bearing capacity2682026-09-18
AnsweredAAbutPier#268462Superstructure wind load in the calculation report1892026-09-18
AnsweredAAbutPier#268451Changing bearing location872026-09-18
AnsweredAAbutPier#268445Main rebar placement2622026-09-17
AnsweredAAbutPier#268438Modeling error in seismic analysis4012026-09-17
AnsweredAAbutPier#268433Pier alignment center1862026-09-17
AnsweredAAbutPier#268431Please check the design ground surface displacement2212026-09-17
AnsweredAAbutPier#268422Question about pier2472026-09-17
AnsweredAAbutPier#268416Wprov calculation in the structural calculation report2342026-09-17
AnsweredAAbutPier#268402Increasing the number of column main rebars3832026-09-16
AnsweredAAbutPier#268392Question about cast-in-place piles2192026-09-16
AnsweredAAbutPier#268387Error when entering reinforcing rebar1712026-09-16
Sign in to ask