Skip to content
AnsweredAAbutPierQ&A #2072822007-10-16 16:52 · Views 25

Water hammer

수충격을 고려하는 거라면 플랜트구조하는 사람에게 문의해보는 것이 좋을듯 싶습니다. 예전에 같이 [개인정보]이 플랜트구조를 몇년 한적이 있었는데 그때 유류저장탱크같은 것에서는 고려해서 설계를 했다고하니

Answer

안녕하세요. 한길아이티입니다. 답변감사드립니다. 해당분야에 있는 분을 찾아보도록 하겠읍니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#268560Question about the calculation report1792026-09-29
AnsweredAAbutPier#268548Tendon force when placing tendons in the pier cap2162026-09-29
AnsweredAAbutPier#268520Pier seismic check2452026-09-23
AnsweredAAbutPier#268509Transverse reinforcement factor, K1912026-09-22
AnsweredAAbutPier#268492Girder positions in slab dimensions3322026-09-21
AnsweredAAbutPier#268483Transverse pile member forces are "0" in pier pile foundation check1982026-09-21
AnsweredAAbutPier#268482Top and bottom rebar detailing error in pier foundation STM2152026-09-21
AnsweredAAbutPier#268476Question about slab dimensions3042026-09-19
AnsweredAAbutPier#268470Settlement and bearing capacity2682026-09-18
AnsweredAAbutPier#268462Superstructure wind load in the calculation report1902026-09-18
AnsweredAAbutPier#268451Changing bearing location872026-09-18
AnsweredAAbutPier#268445Main rebar placement2632026-09-17
AnsweredAAbutPier#268438Modeling error in seismic analysis4012026-09-17
AnsweredAAbutPier#268433Pier alignment center1862026-09-17
AnsweredAAbutPier#268431Please check the design ground surface displacement2232026-09-17
AnsweredAAbutPier#268422Question about pier2472026-09-17
AnsweredAAbutPier#268416Wprov calculation in the structural calculation report2342026-09-17
AnsweredAAbutPier#268402Increasing the number of column main rebars3872026-09-16
AnsweredAAbutPier#268392Question about cast-in-place piles2202026-09-16
AnsweredAAbutPier#268387Error when entering reinforcing rebar1722026-09-16
Sign in to ask