File ***
화일 올려드립니다. 거더제원 입력시 e-beam도 사용가능케 되도록 검토하여 주십시요..
Answer
안녕하세요. 한길아이티입니다. e-beam의 경우 거더 연속된 교량형식입니다. 빔배치의 경우는 거더연속된 부분은 지원하고있지 않으며, 단면제원은 IPC 거더나 PSC 거더에서 제원을 수정하여 쓰쎠야만 합니다. 지간구성에서 거더의 연장을 정해주시고 그러한 부분을 통해서 하부설계를 가능하게 하고 있습니다. e-beam 제원 부분은 검토후 추후 반영토록 하겠으나 현재로서는 일정이 확정되지 않아 일정에 대한 부분은 답변해드릴수가 없어서 죄송합니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #268560 | Question about the calculation report | 180 | 2026-09-29 |
| Answered | AAbutPier | #268548 | Tendon force when placing tendons in the pier cap | 216 | 2026-09-29 |
| Answered | AAbutPier | #268520 | Pier seismic check | 245 | 2026-09-23 |
| Answered | AAbutPier | #268509 | Transverse reinforcement factor, K | 191 | 2026-09-22 |
| Answered | AAbutPier | #268492 | Girder positions in slab dimensions | 332 | 2026-09-21 |
| Answered | AAbutPier | #268483 | Transverse pile member forces are "0" in pier pile foundation check | 198 | 2026-09-21 |
| Answered | AAbutPier | #268482 | Top and bottom rebar detailing error in pier foundation STM | 215 | 2026-09-21 |
| Answered | AAbutPier | #268476 | Question about slab dimensions | 304 | 2026-09-19 |
| Answered | AAbutPier | #268470 | Settlement and bearing capacity | 268 | 2026-09-18 |
| Answered | AAbutPier | #268462 | Superstructure wind load in the calculation report | 190 | 2026-09-18 |
| Answered | AAbutPier | #268451 | Changing bearing location | 87 | 2026-09-18 |
| Answered | AAbutPier | #268445 | Main rebar placement | 263 | 2026-09-17 |
| Answered | AAbutPier | #268438 | Modeling error in seismic analysis | 402 | 2026-09-17 |
| Answered | AAbutPier | #268433 | Pier alignment center | 186 | 2026-09-17 |
| Answered | AAbutPier | #268431 | Please check the design ground surface displacement | 223 | 2026-09-17 |
| Answered | AAbutPier | #268422 | Question about pier | 247 | 2026-09-17 |
| Answered | AAbutPier | #268416 | Wprov calculation in the structural calculation report | 234 | 2026-09-17 |
| Answered | AAbutPier | #268402 | Increasing the number of column main rebars | 389 | 2026-09-16 |
| Answered | AAbutPier | #268392 | Question about cast-in-place piles | 220 | 2026-09-16 |
| Answered | AAbutPier | #268387 | Error when entering reinforcing rebar | 173 | 2026-09-16 |