AnsweredAAbutPierQ&A #2070962007-10-11 14:22 · Views 18

Rebar quantity below bridge bearing differs between program and Excel sheet

보내드리는 파일을 보시면 교량받침하면 철근량 산정시 필요철근량이 프로그램상 교축직각방향 : 3764.092 출력된 엑셀시트상 : 7740.665 이렇게 차이가 납니다 왜그런지 알려주세효

Answer

안녕하세요. 한길아이티입니다. 다음화면을 참고하시기 바랍니다. (그림 생략) 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#268560Question about the calculation report1802026-09-29
AnsweredAAbutPier#268548Tendon force when placing tendons in the pier cap2172026-09-29
AnsweredAAbutPier#268520Pier seismic check2452026-09-23
AnsweredAAbutPier#268509Transverse reinforcement factor, K1912026-09-22
AnsweredAAbutPier#268492Girder positions in slab dimensions3342026-09-21
AnsweredAAbutPier#268483Transverse pile member forces are "0" in pier pile foundation check1982026-09-21
AnsweredAAbutPier#268482Top and bottom rebar detailing error in pier foundation STM2162026-09-21
AnsweredAAbutPier#268476Question about slab dimensions3052026-09-19
AnsweredAAbutPier#268470Settlement and bearing capacity2682026-09-18
AnsweredAAbutPier#268462Superstructure wind load in the calculation report1902026-09-18
AnsweredAAbutPier#268451Changing bearing location872026-09-18
AnsweredAAbutPier#268445Main rebar placement2632026-09-17
AnsweredAAbutPier#268438Modeling error in seismic analysis4022026-09-17
AnsweredAAbutPier#268433Pier alignment center1862026-09-17
AnsweredAAbutPier#268431Please check the design ground surface displacement2232026-09-17
AnsweredAAbutPier#268422Question about pier2472026-09-17
AnsweredAAbutPier#268416Wprov calculation in the structural calculation report2342026-09-17
AnsweredAAbutPier#268402Increasing the number of column main rebars3892026-09-16
AnsweredAAbutPier#268392Question about cast-in-place piles2202026-09-16
AnsweredAAbutPier#268387Error when entering reinforcing rebar1752026-09-16
Sign in to ask