AnsweredAAbutPierQ&A #2070782007-10-11 20:54 · Views 20

Coping step location

P2 교각단면도제원에서 코핑단차위치와 기둥중심위치가 500 이격됩니다 DL1값을 3400으로 적용하려면 어떻게 해야되나요.

Answer

안녕하세요. 한길아이티입니다. 슬래브제원입력에서 교좌면단차를 이용하시기 바랍니다. 해당위치을 캡쳐해서 올려드리니 참고하시기 바랍니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#268560Question about the calculation report1802026-09-29
AnsweredAAbutPier#268548Tendon force when placing tendons in the pier cap2172026-09-29
AnsweredAAbutPier#268520Pier seismic check2452026-09-23
AnsweredAAbutPier#268509Transverse reinforcement factor, K1912026-09-22
AnsweredAAbutPier#268492Girder positions in slab dimensions3342026-09-21
AnsweredAAbutPier#268483Transverse pile member forces are "0" in pier pile foundation check1982026-09-21
AnsweredAAbutPier#268482Top and bottom rebar detailing error in pier foundation STM2162026-09-21
AnsweredAAbutPier#268476Question about slab dimensions3052026-09-19
AnsweredAAbutPier#268470Settlement and bearing capacity2682026-09-18
AnsweredAAbutPier#268462Superstructure wind load in the calculation report1902026-09-18
AnsweredAAbutPier#268451Changing bearing location872026-09-18
AnsweredAAbutPier#268445Main rebar placement2632026-09-17
AnsweredAAbutPier#268438Modeling error in seismic analysis4022026-09-17
AnsweredAAbutPier#268433Pier alignment center1862026-09-17
AnsweredAAbutPier#268431Please check the design ground surface displacement2232026-09-17
AnsweredAAbutPier#268422Question about pier2472026-09-17
AnsweredAAbutPier#268416Wprov calculation in the structural calculation report2342026-09-17
AnsweredAAbutPier#268402Increasing the number of column main rebars3892026-09-16
AnsweredAAbutPier#268392Question about cast-in-place piles2202026-09-16
AnsweredAAbutPier#268387Error when entering reinforcing rebar1752026-09-16
Sign in to ask