Wing wall reinforcement drawing and rebar schedule do not match
시 종점부의 날개벽 주철근의 철근 넘버와 재료표의 철근의 길이와 갯수가 상이합니다 좌측 날개벽의 경우 WL7번 철근이 변단철근인데 재료표에서는 WL7 철근이 직철근으로 산출되며 WL8번이 배근도에서는 직철근인데 재료표에서는 변단철근으로 나옵니다 갯수도 서로 바뀐거 같습니다 일반형식의 날개벽의 주철근이 전부 같은상황입니다 확인부탁드립니다 아 그리고 파일 두개를 동시에는 못올리나요?
Answer
안녕하세요. 한길아이티입니다. 날개벽에 대한 철근산정시 오류가 있었읍니다. 수정하여 오늘까지 업데이트 하도록 하겠읍니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #268560 | Question about the calculation report | 180 | 2026-09-29 |
| Answered | AAbutPier | #268548 | Tendon force when placing tendons in the pier cap | 217 | 2026-09-29 |
| Answered | AAbutPier | #268520 | Pier seismic check | 245 | 2026-09-23 |
| Answered | AAbutPier | #268509 | Transverse reinforcement factor, K | 191 | 2026-09-22 |
| Answered | AAbutPier | #268492 | Girder positions in slab dimensions | 334 | 2026-09-21 |
| Answered | AAbutPier | #268483 | Transverse pile member forces are "0" in pier pile foundation check | 198 | 2026-09-21 |
| Answered | AAbutPier | #268482 | Top and bottom rebar detailing error in pier foundation STM | 216 | 2026-09-21 |
| Answered | AAbutPier | #268476 | Question about slab dimensions | 305 | 2026-09-19 |
| Answered | AAbutPier | #268470 | Settlement and bearing capacity | 268 | 2026-09-18 |
| Answered | AAbutPier | #268462 | Superstructure wind load in the calculation report | 190 | 2026-09-18 |
| Answered | AAbutPier | #268451 | Changing bearing location | 87 | 2026-09-18 |
| Answered | AAbutPier | #268445 | Main rebar placement | 263 | 2026-09-17 |
| Answered | AAbutPier | #268438 | Modeling error in seismic analysis | 402 | 2026-09-17 |
| Answered | AAbutPier | #268433 | Pier alignment center | 186 | 2026-09-17 |
| Answered | AAbutPier | #268431 | Please check the design ground surface displacement | 223 | 2026-09-17 |
| Answered | AAbutPier | #268422 | Question about pier | 247 | 2026-09-17 |
| Answered | AAbutPier | #268416 | Wprov calculation in the structural calculation report | 234 | 2026-09-17 |
| Answered | AAbutPier | #268402 | Increasing the number of column main rebars | 389 | 2026-09-16 |
| Answered | AAbutPier | #268392 | Question about cast-in-place piles | 220 | 2026-09-16 |
| Answered | AAbutPier | #268387 | Error when entering reinforcing rebar | 175 | 2026-09-16 |