Inquiry about pier end beam dimensions (bearing locations)
1. Pier부 : 단면도제원에서는 받침위치가 잘 나온것 같은데...두부보제원의 받침위치가 이상합니다. 2. Abut부 : 날개벽에서 수평철근이 표시가 되지 않습니다. 검토부탁드립니다.
Answer
안녕하세요. 한길아이티입니다. 1.단면도제원에서 설정하신 형식은 T형교각이 아니라 벽식교각이므로 교각설계환경-설계조건-교각형식을 T형교각->벽식교각으로 변경후 교각단면조제원에서 TL=TB=0,HL1,HL2=0,CL=0으로 입력하셔야지 벽식교각으로 설정하시게 되는것입니다. 2.올려주신 화일과 같이 날개벽을 본체측면에 부착시킨후 날개벽제원에서 "날개벽을 본체측면에 부착"을 on하신후 작업을 하셔야 합니다. 1,2번작업을 한화일을 올려드리니 참고하시기 바랍니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #268560 | Question about the calculation report | 180 | 2026-09-29 |
| Answered | AAbutPier | #268548 | Tendon force when placing tendons in the pier cap | 218 | 2026-09-29 |
| Answered | AAbutPier | #268520 | Pier seismic check | 248 | 2026-09-23 |
| Answered | AAbutPier | #268509 | Transverse reinforcement factor, K | 192 | 2026-09-22 |
| Answered | AAbutPier | #268492 | Girder positions in slab dimensions | 335 | 2026-09-21 |
| Answered | AAbutPier | #268483 | Transverse pile member forces are "0" in pier pile foundation check | 198 | 2026-09-21 |
| Answered | AAbutPier | #268482 | Top and bottom rebar detailing error in pier foundation STM | 216 | 2026-09-21 |
| Answered | AAbutPier | #268476 | Question about slab dimensions | 306 | 2026-09-19 |
| Answered | AAbutPier | #268470 | Settlement and bearing capacity | 269 | 2026-09-18 |
| Answered | AAbutPier | #268462 | Superstructure wind load in the calculation report | 191 | 2026-09-18 |
| Answered | AAbutPier | #268451 | Changing bearing location | 87 | 2026-09-18 |
| Answered | AAbutPier | #268445 | Main rebar placement | 264 | 2026-09-17 |
| Answered | AAbutPier | #268438 | Modeling error in seismic analysis | 404 | 2026-09-17 |
| Answered | AAbutPier | #268433 | Pier alignment center | 186 | 2026-09-17 |
| Answered | AAbutPier | #268431 | Please check the design ground surface displacement | 223 | 2026-09-17 |
| Answered | AAbutPier | #268422 | Question about pier | 248 | 2026-09-17 |
| Answered | AAbutPier | #268416 | Wprov calculation in the structural calculation report | 235 | 2026-09-17 |
| Answered | AAbutPier | #268402 | Increasing the number of column main rebars | 391 | 2026-09-16 |
| Answered | AAbutPier | #268392 | Question about cast-in-place piles | 222 | 2026-09-16 |
| Answered | AAbutPier | #268387 | Error when entering reinforcing rebar | 175 | 2026-09-16 |