AnsweredAAbutPierQ&A #2057472007-08-10 19:47 · Views 56

About seismic horizontal force at the abutment fixed end

교대 고정단 지진시 수평력에 대해서 ③ 고정단 하부구조에 작용하는 지진시 수평력 : 탄성받침인 경우 Ff = 69.696 x cos116.8 + 72.524 x sin116.8 = 96.144 kN/m <TD class=xl22 style="BORDER-RIGHT: #c0c0c0; BORDER-TOP: #c0c0c0; BORDER-LEFT: #c0c0c0; BORDER-BOTTOM: #c0c0c0; BA

Answer

안녕하세요. 한길아이티입니다. 작업하고 계신 apr화일과 출력된계산서에 해당부분을 표시해서 올려주시기 바랍니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#268560Question about the calculation report1802026-09-29
AnsweredAAbutPier#268548Tendon force when placing tendons in the pier cap2182026-09-29
AnsweredAAbutPier#268520Pier seismic check2482026-09-23
AnsweredAAbutPier#268509Transverse reinforcement factor, K1922026-09-22
AnsweredAAbutPier#268492Girder positions in slab dimensions3352026-09-21
AnsweredAAbutPier#268483Transverse pile member forces are "0" in pier pile foundation check1982026-09-21
AnsweredAAbutPier#268482Top and bottom rebar detailing error in pier foundation STM2162026-09-21
AnsweredAAbutPier#268476Question about slab dimensions3062026-09-19
AnsweredAAbutPier#268470Settlement and bearing capacity2692026-09-18
AnsweredAAbutPier#268462Superstructure wind load in the calculation report1912026-09-18
AnsweredAAbutPier#268451Changing bearing location872026-09-18
AnsweredAAbutPier#268445Main rebar placement2642026-09-17
AnsweredAAbutPier#268438Modeling error in seismic analysis4042026-09-17
AnsweredAAbutPier#268433Pier alignment center1862026-09-17
AnsweredAAbutPier#268431Please check the design ground surface displacement2242026-09-17
AnsweredAAbutPier#268422Question about pier2492026-09-17
AnsweredAAbutPier#268416Wprov calculation in the structural calculation report2362026-09-17
AnsweredAAbutPier#268402Increasing the number of column main rebars3912026-09-16
AnsweredAAbutPier#268392Question about cast-in-place piles2222026-09-16
AnsweredAAbutPier#268387Error when entering reinforcing rebar1752026-09-16
Sign in to ask