Check of reinforcing rebar under bearings
apier 화면의 설계검토에서는 O.k 인데 계산서 상에는 필요철근량이 커지면서 N.G로 출력됩니다. 교각2번 받침입니다. 검토부탁드립니다.
Answer
안녕하세요. 한길아이티입니다. 프로그램입력화면에서 설계검토시는 각교량받침에 작용하는 수직력,수평력을 가지고 검토가 되지만 계산서 출력시는 교각설계환경-설계선택사항-교좌면검토시 교량받침 선택방법에 따라 하나의받침에 대해서만 출력하게 됩니다. 올려주신화일처럼 최대수직력,수평력을 조합을 선택하면 수직력최대,수평력최대를 조합해서 검토를 하기때문에 설계검토와 상이하게 되는것입니다. 그외 다른 옵션을 선택시에는 같은 결과값이 나오게 됩니다. 실제로 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #268560 | Question about the calculation report | 180 | 2026-09-29 |
| Answered | AAbutPier | #268548 | Tendon force when placing tendons in the pier cap | 218 | 2026-09-29 |
| Answered | AAbutPier | #268520 | Pier seismic check | 248 | 2026-09-23 |
| Answered | AAbutPier | #268509 | Transverse reinforcement factor, K | 192 | 2026-09-22 |
| Answered | AAbutPier | #268492 | Girder positions in slab dimensions | 335 | 2026-09-21 |
| Answered | AAbutPier | #268483 | Transverse pile member forces are "0" in pier pile foundation check | 198 | 2026-09-21 |
| Answered | AAbutPier | #268482 | Top and bottom rebar detailing error in pier foundation STM | 216 | 2026-09-21 |
| Answered | AAbutPier | #268476 | Question about slab dimensions | 306 | 2026-09-19 |
| Answered | AAbutPier | #268470 | Settlement and bearing capacity | 269 | 2026-09-18 |
| Answered | AAbutPier | #268462 | Superstructure wind load in the calculation report | 191 | 2026-09-18 |
| Answered | AAbutPier | #268451 | Changing bearing location | 87 | 2026-09-18 |
| Answered | AAbutPier | #268445 | Main rebar placement | 264 | 2026-09-17 |
| Answered | AAbutPier | #268438 | Modeling error in seismic analysis | 404 | 2026-09-17 |
| Answered | AAbutPier | #268433 | Pier alignment center | 186 | 2026-09-17 |
| Answered | AAbutPier | #268431 | Please check the design ground surface displacement | 225 | 2026-09-17 |
| Answered | AAbutPier | #268422 | Question about pier | 250 | 2026-09-17 |
| Answered | AAbutPier | #268416 | Wprov calculation in the structural calculation report | 237 | 2026-09-17 |
| Answered | AAbutPier | #268402 | Increasing the number of column main rebars | 391 | 2026-09-16 |
| Answered | AAbutPier | #268392 | Question about cast-in-place piles | 222 | 2026-09-16 |
| Answered | AAbutPier | #268387 | Error when entering reinforcing rebar | 175 | 2026-09-16 |