AnsweredAAbutPierQ&A #2035572007-05-07 19:37 · Views 30

About pier shear reinforcement

좀전에 전화로 말씀드린 내용인데요 교각 P7번 기초에 전단철근이 필요한 것으로 계산되었는데요 철근제원에서 권고안시 상세16번을 상세 18번으로 바꾸어서 구조도를 출력하니 조립철근으로 배근이 됩니다. 확인바랍니다. 상세 16으로 배근시 전단철근으로 배근되는 것은 확인하였습니다. 교대처럼 옵션처리는 불가능한지요? [개인정보] 구조2부 [개인정보] [개인정보]

Answer

안녕하세요. 한길아이티입니다. 철근제원에서 수정한 상세와 철근제원은 도면중 철근상세,철근재료표에만 영향이 가고 배근도에는 적용되지 않는 부분입니다. 따라서 배근도는 사용자가 수정해야 하는 부분입니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#268560Question about the calculation report1802026-09-29
AnsweredAAbutPier#268548Tendon force when placing tendons in the pier cap2182026-09-29
AnsweredAAbutPier#268520Pier seismic check2482026-09-23
AnsweredAAbutPier#268509Transverse reinforcement factor, K1922026-09-22
AnsweredAAbutPier#268492Girder positions in slab dimensions3352026-09-21
AnsweredAAbutPier#268483Transverse pile member forces are "0" in pier pile foundation check1982026-09-21
AnsweredAAbutPier#268482Top and bottom rebar detailing error in pier foundation STM2162026-09-21
AnsweredAAbutPier#268476Question about slab dimensions3062026-09-19
AnsweredAAbutPier#268470Settlement and bearing capacity2692026-09-18
AnsweredAAbutPier#268462Superstructure wind load in the calculation report1912026-09-18
AnsweredAAbutPier#268451Changing bearing location872026-09-18
AnsweredAAbutPier#268445Main rebar placement2692026-09-17
AnsweredAAbutPier#268438Modeling error in seismic analysis4042026-09-17
AnsweredAAbutPier#268433Pier alignment center1862026-09-17
AnsweredAAbutPier#268431Please check the design ground surface displacement2272026-09-17
AnsweredAAbutPier#268422Question about pier2512026-09-17
AnsweredAAbutPier#268416Wprov calculation in the structural calculation report2402026-09-17
AnsweredAAbutPier#268402Increasing the number of column main rebars3912026-09-16
AnsweredAAbutPier#268392Question about cast-in-place piles2222026-09-16
AnsweredAAbutPier#268387Error when entering reinforcing rebar1752026-09-16