Please review abutment (railway bridge) calculation report
교대(철도교)계산서 검토바랍니다.
Answer
안녕하세요. 한길아이티입니다. 1.교대계산서 안전성 검토에서 COMB8 하중조합은 COMB 8 : 2 + 4 + 6 + 9- > COMB 8 : 2 + 4 + 6 + 7 + 9 + 12으로 수정하였읍니다. 2.사용성검토는 평상시에 작용하므로 상시에 의한 조합만 검토하게 됩니다. 3.『철도교 설계기준(철도교편)』17p에 의하면 원심하중(CF)과 횡하중(LF)이 동시에 작용하는 경우 큰 쪽의 하중이 작용하는 것으로 가정한다에 근거해서 원심하중과 횡하중를 비교해서 하중재하시 큰값을 가지고 CF하중케이스로 통합되어서 하중이 재하되고 있읍니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #268560 | Question about the calculation report | 180 | 2026-09-29 |
| Answered | AAbutPier | #268548 | Tendon force when placing tendons in the pier cap | 218 | 2026-09-29 |
| Answered | AAbutPier | #268520 | Pier seismic check | 248 | 2026-09-23 |
| Answered | AAbutPier | #268509 | Transverse reinforcement factor, K | 192 | 2026-09-22 |
| Answered | AAbutPier | #268492 | Girder positions in slab dimensions | 335 | 2026-09-21 |
| Answered | AAbutPier | #268483 | Transverse pile member forces are "0" in pier pile foundation check | 198 | 2026-09-21 |
| Answered | AAbutPier | #268482 | Top and bottom rebar detailing error in pier foundation STM | 216 | 2026-09-21 |
| Answered | AAbutPier | #268476 | Question about slab dimensions | 306 | 2026-09-19 |
| Answered | AAbutPier | #268470 | Settlement and bearing capacity | 269 | 2026-09-18 |
| Answered | AAbutPier | #268462 | Superstructure wind load in the calculation report | 191 | 2026-09-18 |
| Answered | AAbutPier | #268451 | Changing bearing location | 87 | 2026-09-18 |
| Answered | AAbutPier | #268445 | Main rebar placement | 269 | 2026-09-17 |
| Answered | AAbutPier | #268438 | Modeling error in seismic analysis | 404 | 2026-09-17 |
| Answered | AAbutPier | #268433 | Pier alignment center | 186 | 2026-09-17 |
| Answered | AAbutPier | #268431 | Please check the design ground surface displacement | 227 | 2026-09-17 |
| Answered | AAbutPier | #268422 | Question about pier | 251 | 2026-09-17 |
| Answered | AAbutPier | #268416 | Wprov calculation in the structural calculation report | 242 | 2026-09-17 |
| Answered | AAbutPier | #268402 | Increasing the number of column main rebars | 391 | 2026-09-16 |
| Answered | AAbutPier | #268392 | Question about cast-in-place piles | 222 | 2026-09-16 |
| Answered | AAbutPier | #268387 | Error when entering reinforcing rebar | 175 | 2026-09-16 |