Pier calculation
받침이 2열인 교각의 경우, 교축방향 해석시 상부반력(고정하중,활하중)에 의해 모멘트RX가 발생하는데 그 방향이 서로 같게 되어 결과적으로 하중이 증가됨. 아래에서 3,6,10,13은 (-)이고 2,4,8,12,14는 (+) 즉, 서로 반대방향이 되어야 함. 이전 버전의 경우 맞게 된 것 같은데 현재는 틀리니 그 사항도 답변바람. LOAD ; 상부 고정하중 반력 NAME=D SW=1.00 TYPE=FORCE ADD= 3 UZ=-200.814, RX=-104.423 ADD= 6 UZ=-121.023, RX=-62.932 ADD=10 UZ=-175.419, RX=-91.218 ADD=13 UZ=-139.844, RX=-72.719 ADD= 2 UZ=-93.632, RX=-48.689 ADD= 4 UZ=-93.753, RX=-48.752 ADD= 8 UZ=-93.707, RX=-48.728 ADD=12 UZ=-93.737, RX=-48.743 ADD=14 UZ=-93.600, RX=-48.672
Answer
안녕하세요. 한길아이티입니다. 전열,후열에 의한 모멘트 방향에 대한 오류는 수정하여 오늘까지 업데이트 하겠읍니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #268560 | Question about the calculation report | 180 | 2026-09-29 |
| Answered | AAbutPier | #268548 | Tendon force when placing tendons in the pier cap | 218 | 2026-09-29 |
| Answered | AAbutPier | #268520 | Pier seismic check | 248 | 2026-09-23 |
| Answered | AAbutPier | #268509 | Transverse reinforcement factor, K | 192 | 2026-09-22 |
| Answered | AAbutPier | #268492 | Girder positions in slab dimensions | 335 | 2026-09-21 |
| Answered | AAbutPier | #268483 | Transverse pile member forces are "0" in pier pile foundation check | 198 | 2026-09-21 |
| Answered | AAbutPier | #268482 | Top and bottom rebar detailing error in pier foundation STM | 216 | 2026-09-21 |
| Answered | AAbutPier | #268476 | Question about slab dimensions | 306 | 2026-09-19 |
| Answered | AAbutPier | #268470 | Settlement and bearing capacity | 269 | 2026-09-18 |
| Answered | AAbutPier | #268462 | Superstructure wind load in the calculation report | 191 | 2026-09-18 |
| Answered | AAbutPier | #268451 | Changing bearing location | 87 | 2026-09-18 |
| Answered | AAbutPier | #268445 | Main rebar placement | 269 | 2026-09-17 |
| Answered | AAbutPier | #268438 | Modeling error in seismic analysis | 404 | 2026-09-17 |
| Answered | AAbutPier | #268433 | Pier alignment center | 186 | 2026-09-17 |
| Answered | AAbutPier | #268431 | Please check the design ground surface displacement | 227 | 2026-09-17 |
| Answered | AAbutPier | #268422 | Question about pier | 251 | 2026-09-17 |
| Answered | AAbutPier | #268416 | Wprov calculation in the structural calculation report | 242 | 2026-09-17 |
| Answered | AAbutPier | #268402 | Increasing the number of column main rebars | 391 | 2026-09-16 |
| Answered | AAbutPier | #268392 | Question about cast-in-place piles | 222 | 2026-09-16 |
| Answered | AAbutPier | #268387 | Error when entering reinforcing rebar | 175 | 2026-09-16 |