Parapet height reference in abutment general drawing
안녕하세요..수고많으십니다.. 교대입력부분에서 흉벽높이가 상이하여 이렇게 글을 올립니다.. 다름이 아니라 일반입력/슬래브제원입력에서 슬래브중앙부 station및 EL은 받침(SHOE)중심기준이고 교대입력/정면도입력에서 교대중심 PARAPET상단 station및 EL은 교량시점기준으로 되어있습니다. 교대입력/단면도입력에서 흉벽높이(PH)가 받침(SHOE)중심기준EL를 기준으로 산정되어 교대높이가 종단구배차만큼의 오차가 발생합니다..흉벽높이(PH)를 교대PARAPET상단 EL을 적용하는게 맞을것같습니다..검토부탁드립니다..
Answer2006-12-28 16:03
안녕하세요. 한길아이티입니다. 검토하고계신 APIER화일을 올려주시기 바랍니다. 그리고 오차의 수치까지 적어주시면 검토하는데 도움이 될것 같읍니다. 감사합니다.
Follow-up2006-12-29 14:15
파일올립니다..오차는 1입니다..철도교라 종단구배가 완만해서.. <><>>
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #268560 | Question about the calculation report | 180 | 2026-09-29 |
| Answered | AAbutPier | #268548 | Tendon force when placing tendons in the pier cap | 218 | 2026-09-29 |
| Answered | AAbutPier | #268520 | Pier seismic check | 248 | 2026-09-23 |
| Answered | AAbutPier | #268509 | Transverse reinforcement factor, K | 192 | 2026-09-22 |
| Answered | AAbutPier | #268492 | Girder positions in slab dimensions | 335 | 2026-09-21 |
| Answered | AAbutPier | #268483 | Transverse pile member forces are "0" in pier pile foundation check | 198 | 2026-09-21 |
| Answered | AAbutPier | #268482 | Top and bottom rebar detailing error in pier foundation STM | 216 | 2026-09-21 |
| Answered | AAbutPier | #268476 | Question about slab dimensions | 306 | 2026-09-19 |
| Answered | AAbutPier | #268470 | Settlement and bearing capacity | 269 | 2026-09-18 |
| Answered | AAbutPier | #268462 | Superstructure wind load in the calculation report | 191 | 2026-09-18 |
| Answered | AAbutPier | #268451 | Changing bearing location | 87 | 2026-09-18 |
| Answered | AAbutPier | #268445 | Main rebar placement | 271 | 2026-09-17 |
| Answered | AAbutPier | #268438 | Modeling error in seismic analysis | 404 | 2026-09-17 |
| Answered | AAbutPier | #268433 | Pier alignment center | 186 | 2026-09-17 |
| Answered | AAbutPier | #268431 | Please check the design ground surface displacement | 229 | 2026-09-17 |
| Answered | AAbutPier | #268422 | Question about pier | 252 | 2026-09-17 |
| Answered | AAbutPier | #268416 | Wprov calculation in the structural calculation report | 243 | 2026-09-17 |
| Answered | AAbutPier | #268402 | Increasing the number of column main rebars | 391 | 2026-09-16 |
| Answered | AAbutPier | #268392 | Question about cast-in-place piles | 222 | 2026-09-16 |
| Answered | AAbutPier | #268387 | Error when entering reinforcing rebar | 175 | 2026-09-16 |