Girder bridge layout on a curved alignment

평면 원곡선 구간에 확폭을 시켜 슬래브를 직으로 펴서 거더교를 계획하려고 합니다. 그런데 빔배치나 받침각도가 직으로 편 슬래브 방향으로 잘 맞춰지질 않네요.. 그리고, 선형방향으로 일일이 길이를 찍어서 입력했는데 다른 쉬운 방법이 없을까요? 화일을 보내드리니 답변 부탁 드립니다.

Answer

안녕하세요. 한길아이티입니다. 현재 apier에서는 확폭에 대한 거더 자동배치와 내진해석은 지원하지 않읍니다. 그러므로 프로그램 외부에서 거더에 대한 배치를 하신후 지점각도입력-교량받침좌표편집-수정한교량받침좌표를 on하신후 다른곳에서 배치한 좌표값을 사용하시는것이 더 나을 것 같읍니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#268560Question about the calculation report1802026-09-29
AnsweredAAbutPier#268548Tendon force when placing tendons in the pier cap2182026-09-29
AnsweredAAbutPier#268520Pier seismic check2482026-09-23
AnsweredAAbutPier#268509Transverse reinforcement factor, K1922026-09-22
AnsweredAAbutPier#268492Girder positions in slab dimensions3352026-09-21
AnsweredAAbutPier#268483Transverse pile member forces are "0" in pier pile foundation check1982026-09-21
AnsweredAAbutPier#268482Top and bottom rebar detailing error in pier foundation STM2162026-09-21
AnsweredAAbutPier#268476Question about slab dimensions3062026-09-19
AnsweredAAbutPier#268470Settlement and bearing capacity2692026-09-18
AnsweredAAbutPier#268462Superstructure wind load in the calculation report1912026-09-18
AnsweredAAbutPier#268451Changing bearing location872026-09-18
AnsweredAAbutPier#268445Main rebar placement2712026-09-17
AnsweredAAbutPier#268438Modeling error in seismic analysis4042026-09-17
AnsweredAAbutPier#268433Pier alignment center1862026-09-17
AnsweredAAbutPier#268431Please check the design ground surface displacement2302026-09-17
AnsweredAAbutPier#268422Question about pier2522026-09-17
AnsweredAAbutPier#268416Wprov calculation in the structural calculation report2452026-09-17
AnsweredAAbutPier#268402Increasing the number of column main rebars3912026-09-16
AnsweredAAbutPier#268392Question about cast-in-place piles2222026-09-16
AnsweredAAbutPier#268387Error when entering reinforcing rebar1752026-09-16
Sign in to ask