s2k file not recognized

교각 모델링 해석시 s2k파일을 찾지 못함이라는 메세지 창이 뜸 sap 실행파일 경로 지정은 제대로 된것 같은데 분명히 폴더 안에 s2k파일이 존재 함에도 불구하고 sap모델링이 실행이 되지 않음

Answer

안녕하세요. 한길아이티입니다. 화일명에 공백을 삭제하시면 제대로 실행됩니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#268560Question about the calculation report1802026-09-29
AnsweredAAbutPier#268548Tendon force when placing tendons in the pier cap2182026-09-29
AnsweredAAbutPier#268520Pier seismic check2482026-09-23
AnsweredAAbutPier#268509Transverse reinforcement factor, K1922026-09-22
AnsweredAAbutPier#268492Girder positions in slab dimensions3352026-09-21
AnsweredAAbutPier#268483Transverse pile member forces are "0" in pier pile foundation check1982026-09-21
AnsweredAAbutPier#268482Top and bottom rebar detailing error in pier foundation STM2162026-09-21
AnsweredAAbutPier#268476Question about slab dimensions3062026-09-19
AnsweredAAbutPier#268470Settlement and bearing capacity2692026-09-18
AnsweredAAbutPier#268462Superstructure wind load in the calculation report1912026-09-18
AnsweredAAbutPier#268451Changing bearing location872026-09-18
AnsweredAAbutPier#268445Main rebar placement2782026-09-17
AnsweredAAbutPier#268438Modeling error in seismic analysis4042026-09-17
AnsweredAAbutPier#268433Pier alignment center1862026-09-17
AnsweredAAbutPier#268431Please check the design ground surface displacement2322026-09-17
AnsweredAAbutPier#268422Question about pier2592026-09-17
AnsweredAAbutPier#268416Wprov calculation in the structural calculation report2462026-09-17
AnsweredAAbutPier#268402Increasing the number of column main rebars3912026-09-16
AnsweredAAbutPier#268392Question about cast-in-place piles2222026-09-16
AnsweredAAbutPier#268387Error when entering reinforcing rebar1752026-09-16
Sign in to ask