About parapet wall rebar

입력항의 흉벽철근이 도면의 흉벽이 상이하게 나타나는데요.. 입력창(D16) - 도면(D19)

Answer

안녕하세요. 한길아이티입니다. 흉벽배면상단 철근은 [교대입력>벽체부배근]에서 입력하시면 됩니다. 철근 직경을 수정한 후에는 [교대입력>철근제원]에서 권고안을 눌러주시기 바랍니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#268560Question about the calculation report1802026-09-29
AnsweredAAbutPier#268548Tendon force when placing tendons in the pier cap2182026-09-29
AnsweredAAbutPier#268520Pier seismic check2482026-09-23
AnsweredAAbutPier#268509Transverse reinforcement factor, K1922026-09-22
AnsweredAAbutPier#268492Girder positions in slab dimensions3352026-09-21
AnsweredAAbutPier#268483Transverse pile member forces are "0" in pier pile foundation check1982026-09-21
AnsweredAAbutPier#268482Top and bottom rebar detailing error in pier foundation STM2162026-09-21
AnsweredAAbutPier#268476Question about slab dimensions3062026-09-19
AnsweredAAbutPier#268470Settlement and bearing capacity2692026-09-18
AnsweredAAbutPier#268462Superstructure wind load in the calculation report1912026-09-18
AnsweredAAbutPier#268451Changing bearing location872026-09-18
AnsweredAAbutPier#268445Main rebar placement2802026-09-17
AnsweredAAbutPier#268438Modeling error in seismic analysis4042026-09-17
AnsweredAAbutPier#268433Pier alignment center1862026-09-17
AnsweredAAbutPier#268431Please check the design ground surface displacement2332026-09-17
AnsweredAAbutPier#268422Question about pier2602026-09-17
AnsweredAAbutPier#268416Wprov calculation in the structural calculation report2462026-09-17
AnsweredAAbutPier#268402Increasing the number of column main rebars3912026-09-16
AnsweredAAbutPier#268392Question about cast-in-place piles2222026-09-16
AnsweredAAbutPier#268387Error when entering reinforcing rebar1752026-09-16
Sign in to ask