Skip to content
AnsweredAAbutPierQ&A #1983462006-04-07 00:04 · Views 92

Reinforcement drawing layout when removing abutment heel

안녕하세요 [개인정보] [개인정보] DR입니다 현장상황때문에 부득이하게 압굽을 제거한 난장이교대를 설계하고 있습니다. 기초부 배근양상이 좀 특이하게 나오고 있어서 질문드립니다. 설계 과정중에 발생하는 NG는 일반 보도육교에 들어가는 교대라서 접속슬래브는 제거했기때문에 발생하는 것입니다. 답변 부탁드리겠습니다. 수고하세욤~ TEL [개인정보]

Answer

안녕하세요. 한길아이티입니다. 앞굽이 없는 경우는 지원되지 않습니다. 다만 앞굽 길이(B1)에 아주 작은 값을 입력하시면 튀는 철근들이 없어지므로 이 상태로 출력하여 작업하시는 것이 좋을것 같습니다. 자세한 사항은 전화로 말씀드렸습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#268560Question about the calculation report1802026-09-29
AnsweredAAbutPier#268548Tendon force when placing tendons in the pier cap2182026-09-29
AnsweredAAbutPier#268520Pier seismic check2482026-09-23
AnsweredAAbutPier#268509Transverse reinforcement factor, K1922026-09-22
AnsweredAAbutPier#268492Girder positions in slab dimensions3352026-09-21
AnsweredAAbutPier#268483Transverse pile member forces are "0" in pier pile foundation check1982026-09-21
AnsweredAAbutPier#268482Top and bottom rebar detailing error in pier foundation STM2162026-09-21
AnsweredAAbutPier#268476Question about slab dimensions3062026-09-19
AnsweredAAbutPier#268470Settlement and bearing capacity2692026-09-18
AnsweredAAbutPier#268462Superstructure wind load in the calculation report1912026-09-18
AnsweredAAbutPier#268451Changing bearing location872026-09-18
AnsweredAAbutPier#268445Main rebar placement2842026-09-17
AnsweredAAbutPier#268438Modeling error in seismic analysis4042026-09-17
AnsweredAAbutPier#268433Pier alignment center1862026-09-17
AnsweredAAbutPier#268431Please check the design ground surface displacement2342026-09-17
AnsweredAAbutPier#268422Question about pier2612026-09-17
AnsweredAAbutPier#268416Wprov calculation in the structural calculation report2492026-09-17
AnsweredAAbutPier#268402Increasing the number of column main rebars3912026-09-16
AnsweredAAbutPier#268392Question about cast-in-place piles2222026-09-16
AnsweredAAbutPier#268387Error when entering reinforcing rebar1752026-09-16
Sign in to ask