Skip to content
AnsweredAAbutPierQ&A #1978562006-02-24 13:52 · Views 120

Question about quantity

1. 아스팔트 방수 수량에서,,, 벽체와 바닥으로 구별해서 나왔으면 합니다. 2. PVC Pipe 갯수에서,,,, dowel bar 갯수와 동일하게 수정가능한 옵션이 있었으면 합니다. 3. 충진재(실런트), 지수판 규격 수정가능 옵션 추가해주셨으면 합니다. ,,,,충진재 : 20X20 지수판 : 300X9 4. 토공수량 중에서,,,, 철도의 경우 어프로치 블럭이 필요하며 이에 따른 수량이 추가되었으면 좋겠습니다. 또한 이에 따른 토공공제수량 (상부노반, 하부노반)이 추가되었으면 합니다. 빠른 답변 부탁드립니다..

Answer

안녕하세요. 한길아이티입니다. 전화상으로 말씀 드렸습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#268560Question about the calculation report1802026-09-29
AnsweredAAbutPier#268548Tendon force when placing tendons in the pier cap2182026-09-29
AnsweredAAbutPier#268520Pier seismic check2482026-09-23
AnsweredAAbutPier#268509Transverse reinforcement factor, K1922026-09-22
AnsweredAAbutPier#268492Girder positions in slab dimensions3352026-09-21
AnsweredAAbutPier#268483Transverse pile member forces are "0" in pier pile foundation check1982026-09-21
AnsweredAAbutPier#268482Top and bottom rebar detailing error in pier foundation STM2162026-09-21
AnsweredAAbutPier#268476Question about slab dimensions3062026-09-19
AnsweredAAbutPier#268470Settlement and bearing capacity2692026-09-18
AnsweredAAbutPier#268462Superstructure wind load in the calculation report1912026-09-18
AnsweredAAbutPier#268451Changing bearing location872026-09-18
AnsweredAAbutPier#268445Main rebar placement2882026-09-17
AnsweredAAbutPier#268438Modeling error in seismic analysis4042026-09-17
AnsweredAAbutPier#268433Pier alignment center1862026-09-17
AnsweredAAbutPier#268431Please check the design ground surface displacement2342026-09-17
AnsweredAAbutPier#268422Question about pier2622026-09-17
AnsweredAAbutPier#268416Wprov calculation in the structural calculation report2492026-09-17
AnsweredAAbutPier#268402Increasing the number of column main rebars3912026-09-16
AnsweredAAbutPier#268392Question about cast-in-place piles2222026-09-16
AnsweredAAbutPier#268387Error when entering reinforcing rebar1752026-09-16
Sign in to ask