AnsweredAAbutPierQ&A #1955262005-10-22 00:08 · Views 17

Rebar quantity issue

수량산출서에 철근 수량이 이상합니다. A1의 경우 도면은 철근 총계가 36.34 ton 인데.. 수량 산출서의 철근 집계에는 50.915 ton으로 나옵니다. 부분적으로는 맞는것도 있는데 이상하네요... 확인 요망합니다.

Answer

안녕하세요. 한길아이티입니다. A1의 경우 36.340은 교대 본체의 철근수량이며, 50.915는 접속슬래브의 철근량인 14.575가 합산이 된 값입니다. 철근집계시에 본체와 접속슬래브를 분리하여 적용하시려면 [출력]-[일반수량산출서 출력]에서 수량산출창을 띄우신 후에 "옵션"을 선택하시고 "수량산출 옵션"에서 철근집계시에 본체와 접속슬래브를 분리하시는 것으로 선택하시면 됩니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#268560Question about the calculation report1802026-09-29
AnsweredAAbutPier#268548Tendon force when placing tendons in the pier cap2182026-09-29
AnsweredAAbutPier#268520Pier seismic check2482026-09-23
AnsweredAAbutPier#268509Transverse reinforcement factor, K1922026-09-22
AnsweredAAbutPier#268492Girder positions in slab dimensions3352026-09-21
AnsweredAAbutPier#268483Transverse pile member forces are "0" in pier pile foundation check1982026-09-21
AnsweredAAbutPier#268482Top and bottom rebar detailing error in pier foundation STM2162026-09-21
AnsweredAAbutPier#268476Question about slab dimensions3062026-09-19
AnsweredAAbutPier#268470Settlement and bearing capacity2692026-09-18
AnsweredAAbutPier#268462Superstructure wind load in the calculation report1912026-09-18
AnsweredAAbutPier#268451Changing bearing location882026-09-18
AnsweredAAbutPier#268445Main rebar placement2912026-09-17
AnsweredAAbutPier#268438Modeling error in seismic analysis4042026-09-17
AnsweredAAbutPier#268433Pier alignment center1862026-09-17
AnsweredAAbutPier#268431Please check the design ground surface displacement2342026-09-17
AnsweredAAbutPier#268422Question about pier2652026-09-17
AnsweredAAbutPier#268416Wprov calculation in the structural calculation report2522026-09-17
AnsweredAAbutPier#268402Increasing the number of column main rebars3912026-09-16
AnsweredAAbutPier#268392Question about cast-in-place piles2222026-09-16
AnsweredAAbutPier#268387Error when entering reinforcing rebar1752026-09-16
Sign in to ask